
IMER INTERNATIONAL S.p.A.
23
10. ENGINE AND COMPRESSOR CHECK
Check the engine oil level and the Diesel fuel tank level before
starting work.
FIG.9 A
67$5783VHHILJDEF
The machine can be used as a compressor, as well as a screed
pump. In which case the ball valve (ref.1) must be positioned in
pos.1b, and the selector (ref.5) on COMPRESSOR. Just open and
close the ball valve, located on the towing side of the compressor,
WRGUDZDLUUHI¿JF
When using the machine as a SCREED PUMP the ball valve
(ref.1) must be in position 1a and the selector on TANK. The
ball valve on the towing side of the compressor must be closed
UHI¿JF
FIG.9 C
$GMXVWWKHEDOOYDOYHUHIDVLQGLFDWHGLQ¿JXUHD
position 2c (between half-way and 3/4 on delivery manifold side).
Make sure the
HPHUJHQF\EXWWRQLVQRWDFWLYDWHGUHI¿JE
,
releasing it if necessary, and that the
grill safety ball valve is
FRPSOHWHO\FORVHGUHI¿J
7XUQWKH212))VHOHFWRUUHI¿JEWR21DQGSUHVVWKH
67$57EXWWRQUHI¿JEWKHFRPSUHVVRUVWDUWV:DLWDWOHDVW
minutes for the engine to warm up.
Close the hatch and the safety ball valve on it.
Do at test run:
3UHVVWKH67$57EXWWRQUHI¿JEWKHOLJKWDWWKHEXWWRQFRPHV
on, the compressor goes to max. speed (version 5200 Nl/min),
and starts delivering air. After about 30 sec. it goes to min. speed:
:DLWXQWLOWKHSUHVVXUHJDXJHUHI¿JEUHDGVEDURSHQWKH
EDOOYDOYHRQWKHKDWFKUHI¿JZDLWXQWLODOOWKHDLULVUHOHDVHG
then open the hatch.
FIG.9 B
Try operating the mixer by means of the distributor lever
UHI¿JE0DNHVXUHWKHJULOOVDIHW\OHYHULVFORVHGUHI¿J
Try lifting and lowering the loading bucket by means of the distribu-
WRUOHYHUUHI¿JE
You are now ready to operate.
The aggregate used must be screened and washed aggregate -
SHUFHQWDJHRI¿OOHUQRWPRUHWKDQDQGLQSXPSDEOHJUDLQ
size: in practice, this means the sand must not be dirty and that
URXJKO\RIWKHDJJUHJDWHVPXVWVPDOOHUWKDQPPLQVL]H
EHWZHHQDQGPPDQGEHWZHHQDQGPP
Fill the tank up to just under half with sand, add cement - 1 bag, 1
bag and 1/2 (1 bag = 25 kg), water, and then the remaining sand,
until the tank is about 3/4 full.
'RQRWFRPSOHWHO\¿OOWKHWDQNRUZRUVHVWLOOXQWLOPDWHULDOVSLOOVRXW
with the last 3-4 shovelfuls of sand the mixing worsens and the
torque required by the mixer increases very much, and therefore
the power absorbed by the engine: the pressure indicated on the
SUHVVXUHJDXJHUHI¿JEPXVWQRWH[FHHGEDU
Allow the mixer to turn for a few seconds, make sure the mixture
wetness is that required, clean the hatch seal and the edge of the
hatch collar, where the seal rests.
- Make sure to wear suitable and certified gloves when
carrying out this operation.
Close the hatch, close the hatch ball valve lever, wait a few secon-
ds for the mixing phase to end, then start pumping by pressing the
START button.
6
8
3
4
5
9
7
12
11
10
13
2
1
Documentazione
senza
certificazione
CE
Documentation
without
CE
certificate
Содержание MOVER 190D
Страница 39: ...IMER INTERNATIONAL S p A 52 TAV 7 Documentazione senza certificazione CE Documentation without CE certificate...
Страница 41: ...IMER INTERNATIONAL S p A 54 TAV 8 Documentazione senza certificazione CE Documentation without CE certificate...
Страница 43: ...IMER INTERNATIONAL S p A 56 TAV 9 Documentazione senza certificazione CE Documentation without CE certificate...
Страница 45: ...IMER INTERNATIONAL S p A 58 TAV 10 Documentazione senza certificazione CE Documentation without CE certificate...