UK
IO-Link master
57
In order to ensure that the watchdog is not triggered during the MRP failure
detection time, it must be set to a larger value than the expected MRP failure
detection time�
The following steps must be carried out:
Right-click on [Profinet IO Interface (PN-IO)], then select [Object Properties]�
► In the [IO Cycle] tab, set the value for [Number of accepted update cycles with
missing IO data] under [Watchdog Time] so that the value under [Watchdog
time (ms)] is greater than 200�
► Close the dialogue with [OK]�
Содержание ECOMAT 300 AL1000
Страница 1: ...Device manual IO Link master ProfiNet AL1000 7391030 00 02 2016 UK ...
Страница 59: ...UK IO Link master 59 ...
Страница 61: ...UK IO Link master 61 ...