EN
4 - MOVEMENT AND INSTALLATION VIP80E-II
4 - Pag. 8 / 22
4.6.3 Alignment and levelling
INFORMATION:
not only alignment and levelling are fundamental for the correct running of the
bar feeder and for the WARRANTY VALIDITY, but also they must be carried out
only by a SKILLED STAFF WITH PRECISE TECHNICAL COMPETENCE.
For the positioning proceed as follows.
• Position the bar feeder near the lathe
(see figure).
• Manually shift the bar pusher (A) until
the end of it is close to the spindle
head (B).
• Use the beam surface for checking the
levelling.
• Verify the bar feeder levelling and the
alignment of both axes.
A
B
A
B
8070_04_08_1
8070_04_09_1
Содержание VIP80E-II
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 8: ......
Страница 10: ......
Страница 16: ...EN 1 INFORMATIONS GÉNÉRALES VIP80E II 1 Pag 6 6 ...
Страница 21: ...2 TECHNICAL INFORMATION VIP80E II EN 2 Pag 5 28 P Electric cabinet houses the electrical control panel ...
Страница 44: ...EN 2 TECHNICAL INFORMATION VIP80E II 2 Pag 28 28 ...
Страница 50: ...EN 3 SAFETY PROCEDURES GENERAL INFORMATION VIP80E II 3 Pag 6 6 ...
Страница 80: ...EN 5 ADJUSTMENTS AND SETUP VIP80E II 5 Pag 8 8 ...
Страница 98: ...EN 7 BAR FEEDER MAINTENANCE VIP80E II 7 Pag 4 6 7 4 GREASING POINTS 8070_07_03_1 Grease Grease ...
Страница 100: ...EN 7 BAR FEEDER MAINTENANCE VIP80E II 7 Pag 6 6 ...
Страница 104: ...EN 8 TROUBLES CAUSES CURES VIP80E II 8 Pag 4 4 ...