4 - MOVEMENT AND INSTALLATION
VIP80E-II
EN
4 - Pag. 5 / 22
4.5
BAR FEEDER INSTALLATION (without displacement)
WARNING - CAUTION:
the installation and connections must be carried out according to the indications
provided by the manufacturer. The responsible person will also take into
account all regulative and law requirements, carrying out all the installations
and connections workmanlike. Once the installation has been completed, and
before the operating phases, he will check if the above-mentioned requirements
have been fulfilled.
The floor should be stable and levelled to guarantee good fastening to the ground.
Provide an area of suitable dimensions according to the type of bar feeder used.
The areas "D" (work area) and "E" (bar feeding area) should be properly delimited to prevent
collisions between the operator and any handling equipment or transport vehicles travelling
near the bar feeder.
The selected area should be illuminated and provided with an electric and pneumatic power
supply socket.
During operation, the bar feeder will release small amounts of oil mist. Install the bar feeder in
a suitably ventilated area.
The bar feeder has not been designed for use in an explosive atmosphere.
Содержание VIP80E-II
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 8: ......
Страница 10: ......
Страница 16: ...EN 1 INFORMATIONS GÉNÉRALES VIP80E II 1 Pag 6 6 ...
Страница 21: ...2 TECHNICAL INFORMATION VIP80E II EN 2 Pag 5 28 P Electric cabinet houses the electrical control panel ...
Страница 44: ...EN 2 TECHNICAL INFORMATION VIP80E II 2 Pag 28 28 ...
Страница 50: ...EN 3 SAFETY PROCEDURES GENERAL INFORMATION VIP80E II 3 Pag 6 6 ...
Страница 80: ...EN 5 ADJUSTMENTS AND SETUP VIP80E II 5 Pag 8 8 ...
Страница 98: ...EN 7 BAR FEEDER MAINTENANCE VIP80E II 7 Pag 4 6 7 4 GREASING POINTS 8070_07_03_1 Grease Grease ...
Страница 100: ...EN 7 BAR FEEDER MAINTENANCE VIP80E II 7 Pag 6 6 ...
Страница 104: ...EN 8 TROUBLES CAUSES CURES VIP80E II 8 Pag 4 4 ...