6 - USE AND OPERATION
SMART316
EN
6 - Pag. 11 / 20
6.4
FEEDER SET-UP AND AUTOMATIC CYCLE START
The following list is a sequence of feeder set-up and automatic cycle start operations required if
the feeder has to be started up for the first time.
• Perform the software parametering (refer to the "Push-button panel instruction manual")
• Carry out feeder set-up according to the bar to be machined (paragraph 5.3.)
• Prepare the bars to be machined (paragraph 6.3).
• Feed bars to the magazine (paragraph 6.4.1).
• Adjust lube oil flow (paragraph 6.4.2).
• Start the automatic cycle (paragraph 6.4.3).
Содержание SMART 316
Страница 4: ......
Страница 34: ...EN 4 HANDLING AND INSTALLATION SMART316 4 Pag 2 24 ...
Страница 56: ...EN 4 HANDLING AND INSTALLATION SMART316 4 Pag 24 24 ...
Страница 64: ...EN 5 ADJUSTMENTS AND SETTING UP SMART316 5 Pag 8 18 Replace the bar pusher supports ...
Страница 100: ...EN 7 BAR FEEDER MAINTENANCE SMART316 7 Pag 6 6 ...
Страница 104: ...EN 8 TROUBLES CAUSES CURES SMART316 8 Pag 4 4 ...
Страница 110: ...EN 9 PART REPLACEMENT SMART316 9 Pag 6 6 ...
Страница 114: ...EN 10 GUIDE CHANNELS BAR PUSHER REVOLVING TIPS SMART316 10 Pag 4 6 ...
Страница 138: ...EN 11 COLLETS SMART316 11 Pag 22 46 ...
Страница 156: ...EN 11 COLLETS SMART316 11 Pag 40 46 ...
Страница 163: ...12 LIST OF AFTER SALES CENTERS SMART316 EN 12 Pag 1 4 INDEX 12 1 LIST OF AFTER SALES CENTERS 2 ...
Страница 166: ...EN 12 LIST OF AFTER SALES CENTERS SMART316 12 Pag 4 4 ...