
Print More Materials, All For Application
- 18 -
3.2 Check Equipment Motion
Step 1
Use 6mm² cable to connect
AC220V single-phase power socket
Step 2
Plug in the power connector at the
rear of the machine to the main
power supply
Step 3
It is shown in Figure 3
Step 4
1. The XYZ axis movement is
controlled manually by touch
screen
2.
Observe whether the figure
moves normally
Step 5
1. Control E1 and E2 extrusion
through the touch screen
2.
Check whether the gears of the
left and right sprinklers rotate
clockwise
Step 6
1. Preheat through touch screen
2. It can set the temperature of hot
bed, left nozzle and right nozzle
3. The temperature on the right
represents the set temperature,
and the temperature on the left
represents the actual temperature
4. Recommended hot bed
temperature for first preheating:
50 ° C ±2 ° C
5. Left and right nozzle
temperature: 210℃±2℃
Please be careful with high
temperature and operate with
caution
Содержание HIGH-TEMPERATURE Series
Страница 7: ...Print More Materials All For Application 7 2 Detailed Parameter 2 1 Specification ...
Страница 8: ...Print More Materials All For Application 8 ...
Страница 10: ...Print More Materials All For Application 10 Internal Chamber ...
Страница 11: ...Print More Materials All For Application 11 Filament Box Electric Box Pressure Gauge Air Pump Cooling Fan ...
Страница 12: ...Print More Materials All For Application 12 Cooling Fan Built In Light Built In Camera Motor Power Outlet ...