51
sERVICINg
vogue combination boiler -
Installation and Servicing
51
sERVICINg
60 sp ARK gENERATOR REpLACEMENT
61 gAs CONTROL VALVE REpLACEMENT
62 DIVERTER VALVE ACTUATOR REpLACEMENT
1. Refer to Frames 45 & 46.
2. Refer to Frame 53.
3. Remove the 2 securing screws at the top of the
casing, ensuring the expansion vessel is safely
supported, and withdraw the spark generator assy.
4. Disconnect the leads from the generator.
5. Remove 2 securing screws.
6.
To replace connect all wiring and then fix the
generator in position using the 2 securing screws,
ensuring the earth lead is firmly fixed under the
lower securing screw, and the expansion vessel is
correctly located.
7. Secure the spark generator assy using 2 screws in
the top of the case.
8. Check the operation of the boiler. Refer to Frames
33-36.
1. Refer to Frames 45 & 46.
2. Refer to Frame 53.
3. Remove the gas inlet pipe. Refer to Frame 54.
4. Unplug the electrical connection.
5. Disconnect the earth lead at the rear of the gas valve.
6. Disconnect the gas service valve
7. Remove the 2 securing screws in the underside of the
boiler casing and remove the valve.
8.
Remove brass injector from gas valve outlet and re-fit
into replacement valve.
9. Replace in reverse order ensuring all seals are in good
condition and the assembly is gas sound.
10. Check the operation of the boiler. Refer to Frames 33-36.
1. Refer to Frames 45 & 46.
2. Refer to Frame 53.
3. Remove the condense trap. Refer to
Frame 50.
4. Disconnect the electrical cable
connection
5. Withdraw the securing clip
6. Lift the valve actuator clear of the valve
body.
7. Replace in reverse order.
8. Check the operation of the boiler. Refer to
Frames 33-36.
5
4
5
3
8
s
ER
VICIN
g
Содержание Vogue Combi c26
Страница 2: ...2 vogue combination boiler Installation and Servicing ...
Страница 68: ......
Страница 74: ...74 NOTEs vogue combination boiler Installation and Servicing ...
Страница 75: ...75 NOTEs vogue combination boiler Installation and Servicing ...