40
INsTALLATION
vogue combination boiler -
Installation and Servicing
INsTALLATION
41 MENU OpERATION
INsTALLER’s DETAILs
The service required message which is displayed after 12
months can be customised to show the installer’s telephone
number. To record your telephone number press ENTER and
the following screen will be displayed.
MENU
Vent System
Switch Pre-Heat
Maximum Flow Temperature
Outside Sensor Slope
Exit
Enter
Press “-” until the following screen is displayed.
MENU
Maximum Flow Temperature
Installer’s Details
Test Condensate Anti-Freeze
Set Zone 2 Flow Temperature
Exit
Enter
Press ENTER and a screen similar to the following will be
displayed.
01482 498704
Exit
Enter
Installer’s Details
No. shown when service due
0
Press “+” and “-“ to change the number and ENTER to accept.
Press ExIT twice to return to normal operation.
TEsT CONDENsATE ANTI-FREEzE
If Ideal’s optional condensate anti-freeze kit has been fitted
to the boiler then to test operation press ENTER and the
following screen will be displayed.
MENU
Vent System
Switch Pre-Heat
Maximum Flow Temperature
Outside Sensor Slope
Exit
Enter
Press “-” until the following screen is displayed.
MENU
Maximum Flow Temperature
Test Condensate Anti-Freeze
Set Zone 2 Flow Temperature
Exit
Enter
Press ENTER and the following screen will be displayed.
Exit
Enter
OFF
Condensate Anti-Freeze
Only active if optional kit purchased
ON for 5mins press
Press ENTER to activate.
Press ExIT twice to return to normal operation.
sET zONE 2 FLOW TEMpERATURE
If a second switched live is connected to the boiler for a second
zone (see Frame 30) then the flow temperature target for
this zone can be set independently. Press ENTER and the
following screen will be displayed.
MENU
Vent System
Switch Pre-Heat
Maximum Flow Temperature
Outside Sensor Slope
Exit
Enter
Press “-“ until the following screen is displayed.
MENU
Test Condensate Anti-Freeze
Set Zone 2 Flow Temperature
Exit
Enter
Press ENTER and the following screen will be displayed.
Set Zone 2 Flow Temperature
°C
70
Exit
Enter
Press “+” & “-“ to change the temperature to the require setting
and then ENTER. Press ExIT to return to normal operation.
pUMp MODULATION
The boiler is factory set for pump operation to give maximum
reliability. If the CH system has been fully balanced then
pump modulation can be increased to reduce electrical energy
consumption, to do so press ENTER and the following screen
is displayed.
MENU
Vent System
Switch Pre-Heat
Maximum Flow Temperature
Outside Sensor Slope
Exit
Enter
Press “-” until the following screen is displayed.
MENU
Exit
Enter
Pump Modulation
Set Zone 2 Flow Temperature
Press ENTER and the following screen will be displayed.
Exit
Enter
Pump Modulation
to save press
For minimum press
to save press
Max
Press “-” to change the setting and then ENTER. Press Exit to
return to normal operation.
IN
s
T
ALLA
TION
Содержание Vogue Combi c26
Страница 2: ...2 vogue combination boiler Installation and Servicing ...
Страница 68: ......
Страница 74: ...74 NOTEs vogue combination boiler Installation and Servicing ...
Страница 75: ...75 NOTEs vogue combination boiler Installation and Servicing ...