![IDEAL Vogue Combi c26 Скачать руководство пользователя страница 26](http://html.mh-extra.com/html/ideal/vogue-combi-c26/vogue-combi-c26_installation-and-servicing_616523026.webp)
26
INsTALLATION
vogue combination boiler -
Installation and Servicing
FLUE OUTLET
Handle
(Shown in closed position)
Handle
(Shown in closed position)
24 CONNECTIONs & FILLINg
IMpORTANT
- when filling:
When filling, there may be a slight water leak from the air vent
therefore electrical connections should be protected.
Note.
The domestic hot water flow rate is
automatically regulated to a maximum:
26 = 10.7
l/m
(2.2 gpm)
32 = 13.1
l/m
(2.8 gpm)
40 = 16.4
l/m
(3.2 gpm)
1. Ensure Filling Loop is connected
2. Ensure dust cap on auto air vent is slackened off .
3. Check all isolation handles on all water connections are in
the open position.
4. Open handle
on the filling loop, then slowly open handle
until pressure gauge reads between 1 to 1.5 bar.
5. Once pressure gauge dial reads between 1 - 1.5 bar turn the
filling loop isolation valves back to the closed position.
6.
Disconnect filling loop at the LH side, ensuring top hat
washer is retained and screw on blanking cap.
7.
Connect extended blanking cap and top hat washer to filling
loop pipe.
FILLINg
Note. Fully open all DHW taps and ensure water is
flowing freely. Once satisfied close all taps.
NOTEs.
Ensure all boss blanking plugs are removed before connecting hardware. Each
valve must be fitted to the correct boss as shown in the picture.
Ensure each union is fitted with fibre seals provided.
Do not subject any of the isolating valves to heat as the seals may be damaged.
WATER CONNECTIONs Ch
1.
Connect the CH flow service valve and copper tail
provided in the hardware pack to the threaded boss
connection provided at the lower rear of the boiler.
2. Connect the CH rtn. valve (black handle) and copper tail.
3. If connecting the boiler to heating loads in excess of
17.6kW (60,000 Btu/h), connecting flow and return heating
systems pipework must be sized in 28mm diameter at the
point of pipe connection to the boiler tails. use 22mm x
28mm pipe adaptors as appropriate.
gAs CONNECTION
IMpORTANT.
The gas service cock is sealed with a non-metallic
blue fibre washer, which must not be overheated when making
capillary connections. Refer to Frame 1 for details of the position
of the gas connection.
For additional gas supply info refer to “Gas Supply” on page 8.
pREssURE RELIEF VALVE DRAIN
The pressure relief valve connection, located at the bottom right-
hand side of the boiler, comprises a 15mm diameter stub pipe.
The Installer to provide a compression joint on the end of the
stub pipe. This assists with pipe removal when servicing.
The discharge pipe should be positioned so that the discharge
of water or steam cannot create a hazard to the occupants of
the premises or damage the electrical components and wiring.
WATER CONNECTIONs DhW
1. Fit the DHW inlet service valve (blue handle) and copper tail
to the threaded boss connection ensuring the seal provided
is correctly located.
2. Fit the DHW outlet pipe tail to DHW outlet connection,
ensuring the seal provided is correctly located.
3.
Fit the filling loop provided between the DHW inlet valve an
the CH return valve
3G9705
Pressure Relief Valve
Drain Connection
15mm elbow
or fittings
(not supplied)
Pressure Relief Valve
Drain Pipe
A purpose made pressure relief valve drain
pipe is provided with the boiler to allow safe
discharge through a wall to the outside of
the building. This is particularly relevant to
‘high rise’ installations but can be used for all
installations.
Blue
Handle
Black
Handle
Black
Handle
Black
Handle
Yellow
Handle
Filling
Loop
CH Flow
DHW
Outlet
Gas
Supply
DHW
Inlet
CH
Return
Note that all isolation
handles are shown in
the open postion.
IN
s
T
ALLA
TION
Содержание Vogue Combi c26
Страница 2: ...2 vogue combination boiler Installation and Servicing ...
Страница 68: ......
Страница 74: ...74 NOTEs vogue combination boiler Installation and Servicing ...
Страница 75: ...75 NOTEs vogue combination boiler Installation and Servicing ...