29
APPENDIX
B: PRE-COMMISSIONING CHECKLIST
GATEWAY
¨
Gateway is installed, has power and is accessible
¨
Ethernet Drop for network connectivity is available for Gateway
¨
IP address has been assigned for Gateway
• If a static IP is being used, the appropriate Netmask, Gateway IP and DNS address for Gateway
are to be made available prior to commissioning
• If DHCP is to be used, a MAC reservation must be created prior to commissioning
¨
User name and password for Gateway have been created and made available
¨
Advanced scheduling has been set up (optional, requires valid NTP server address)
PROXY
¨
Server has been selected to host proxy software
• Windows 7 or better
- 2GHZ CPU minimum
- 2GB RAM minimum
- 10MBPS network interface
• Mac OS
• Linux
¨
Port 993 (outgoing) open to the Internet
¨
Proxy has network connectivity to all Gateways
PHYSICAL INSTALLATION
¨
All Luminaire Controllers installed per plan
¨
All sensors and switches powered on and installed per plan
DATA COLLECTION
¨
Detachable bar code label from each Luminaire Controller, sensor and switch have been removed and placed
on reflected ceiling plan or other document to record location of each device
¨
Fixture information recorded for accurate consumption reporting
• Voltage
• Amp draw
• Power factor
• Bulb type
CONFIGURATION
¨
Desired Room names and Room Groups have been provided
¨
Floor plan image (PDF, JPEG or PNG) provided for visual Room selection (optional)
¨
Scheduling, Occupancy or Vacancy defined for each Room
• Vacancy timeout
• Occupancy/Vacancy dim
• Schedule (if applicable)
¨
Up to four Scenes defined for each Room (optional)
• Scene name
• Desired light levels for each Luminaire Controller for each scene
¨
Upper and lower light levels for daylight harvesting areas defined
PERSONNEL AVAILABILITY
¨
Authorized person available to walk through space to answer questions on configuration and sign off on final
commissioning
¨
Person(s) are available for Audacy system operation training upon completion of commissioning
Содержание Audacy Wireless Controls
Страница 1: ...1 OPERATIONS USER MANUAL NOVEMBER 2016 ...
Страница 5: ...5 INSTALL ...
Страница 17: ...17 CONFIGURE ...
Страница 20: ...20 CONTROL ...
Страница 27: ...27 APPENDIX ...
Страница 34: ...34 APPENDIX F LUMINAIRE CONTROLLER ONE LINE DRAWINGS ESCGRID 1000 PWM LUMINAIRE CONTROLLER ...
Страница 35: ...35 APPENDIX E LUMINAIRE CONTROLLER REQUIREMENTS ESCD 1000 LVDC LUMINAIRE CONTROLLER EXTERNAL MOUNT ...
Страница 36: ...36 APPENDIX F LUMINAIRE CONTROLLER WIRING DIAGRAMS SCC 1000 347V LUMINAIRE CONTROLLER AT FIXTURE ...
Страница 37: ...37 APPENDIX F LUMINAIRE CONTROLLER WIRING DIAGRAMS SCL 1000 LUMINAIRE CONTROLLER INTERNAL MOUNT AT FIXTURE ...
Страница 39: ...39 APPENDIX F LUMINAIRE CONTROLLER WIRING DIAGRAMS SCD 1000 LUMINAIRE CONTROLLER EXTERNAL MOUNT ON FIXTURE ...
Страница 40: ...40 APPENDIX F LUMINAIRE CONTROLLER WIRING DIAGRAMS SCD 1000 LUMINAIRE CONTROLLER EXTERNAL MOUNT MULTI FIXTURE ...
Страница 42: ...42 APPENDIX G SENSOR COVERAGE PATTERNS WALL MOUNT MODEL VSW 1300 G SENSOR COVERAGE PATTERNS ...
Страница 43: ...43 APPENDIX F LUMINAIRE CONTROLLER ONE LINE DRAWINGS CEILING MOUNT MODEL VSC 1300 ...
Страница 47: ...47 APPENDIX Duplicate as needed ROOM LOCATION DEVICE TYPE SERIAL ...