Installation and Servicing
INSTALLATION
25 WATER CONNECTIONS
Refer to General Note, Frame 24, for guidance.
Note.
Do not subject any of the isolating valves to heat as the
seals may be damaged.
General Notes
1.
Fitting the Piping Frame, top entry pipework is an option,
as well as mounting from the bottom or through the wall.
If pipes are run vertically within the boiler back space
provided by optional stand-off frame positions they must
avoid any obstructions imposed by the channels and by a
rear facing flue, should this position be selected.
24 SERVICE CONNECTIONS
2.
Horizontal connecting pipes, where used, must be run
outside the limits of the boiler casing.
2070
22mm copper pipe
Isolating valve
(shown in the
open position)
Piping frame
Drain
point
22mm copper pipe
Isolating valve
(shown in the
open position)
Pressure gauge
FLOW
RETURN
INST
ALLA
TION