
12
icos system condensing -
Installation and Servicing
INSTALLATION
8
UNPACKING
The boiler is supplied fully assembled in one Pack A,
together with a standard flue assembly for lengths up to
460mm, rear or side flue outlet, in Pack B.
Optional extras, if ordered, are available in separate boxes.
Unpack and check the contents.
Hardware Pack
z
50mm x No.10 wood screws -
3 off.
z
Wall plugs (TP2B ) - 3 off.
z
Water treatment warning
label.
z
Turret clamp.
z
M5 x 10 pozi Hex screw.
z
22mm compression nut and
olive - 2 off.
z
Safety drain pipe nut and
olive.
z
Flow isolating valve c/w
pressure gauge.
z
22mm fibre washers - 2 off.
Pack A Contents
Also contained in Pack A:
z
Hardware Pack (listed below).
z
These Installation & Servicing Instructions.
z
The User's Instructions.
z
The User Control.
z
Benchmark log book.
1.
Ensure the boiler is stood correctly as marked on the
carton.
2.
Remove the strapping.
3.
Fold back the top flaps to gain access to the wall
mounting plate, instructions, hardware pack and
user control.
4.
Remove the instructions and read thoroughly before
unpacking the product. Unpack the user’s control
and hardware pack and retain in a safe place.
5.
When ready for installation lift off the cardboard
carton.
6.
Dispose of packaging.
9
PACKAGING REMOVAL
Pack B Contents
Flue turret.
Flue terminal.
Flue support cutting aid - 1 off.
2066
E
c
l
1
4
6
0
Flue terminal
Flue turret assembly
2006
INST
ALLA
TION
Содержание icos system m3080
Страница 1: ......
Страница 51: ...51 icos system condensing Installation and Servicing NOTES ...
Страница 53: ......