PART 4
INFORMATION
Model:
Serial number:
Furnace installation date:
Service telephone # - Day:
Night:
Dealer name and address:
START-UP TEST RESULTS
Nozzle:
Pressure:
lbpsi
Burner adjustments:
Primary air
Fine
air
Drawer
assembly
CO
2
:
% Smoke scale:
(Bacharach)
Gross stack temperature:
°F
Ambient temperature:
°F
Chimney draft:
" W.C.
Overfire draft:
" W.C.
Test performed by:
22
Содержание OLR105A12D
Страница 25: ...DNS 0571 Rev C DNS 0573 Rev C FIGURE 5 1 Model OLR105A12D FIGURE 5 2 Model OLR160B20C 26...
Страница 26: ...FIGURE 5 3 Model OUF105A12C FIGURE 5 4 Model OUF160B18C DNS 0572 Rev D DNS 0568 Rev C 27...
Страница 27: ...FIGURE 5 5 Model OLF105A12C DNS 0570 Rev C FIGURE 5 6 Model NOUF105A12D DNS 0674 Rev E 28...
Страница 28: ...FIGURE 5 7 Model NOLF105A12D DNS 0676 Rev D 29...
Страница 29: ...FIGURE 6 Wiring diagram OLR105A12D OLR160B20C OUF105A12C NOUF105A12D OUF160B18C OLF105A12C NOLF105A12D 30...
Страница 30: ...COMPONENTS AND REPLACEMENT PARTS 31...
Страница 31: ...PARTS LIST Model OLR105A12D B50031 B 32...
Страница 33: ...PARTS LIST Model OLR160B20C B50032 C 34...
Страница 35: ...PARTS LIST Model OUF105A12C B50033 B 36...
Страница 37: ...PARTS LIST Model OUF160B18C B50034 D 38...
Страница 39: ...PARTS LIST Model OLF105A12C B50035 B 40...
Страница 41: ...PARTS LIST Model NOLF105A12D B50037 B 42...
Страница 43: ...PARTS LIST Model NOUF105A12D B50036 B 44...