Installation
49
TURBULATOR ASSEMBLY
To assemble the turbulators supplied with the boiler, open the door and insert the turbulators completely into the smoke pipes,
until they penetrate by at least 100 m.
100
mm
The dimensions, diameter and length (ØxP) and the quantities (no.) of the turbulators (Tb) for the various models, are specified in
the
”Hydraulic fittings”
table in paragraph
“Dimensions and fittings”
ELECTRICAL CONNECTIONS
The
ECOVAPOR
feature a control panel (IP 55 insulation class) to be completed by fitting the two factory equipped connectors to
the various generator components. Panel model depends on the version of the ordered generator and the specific and detailed
wiring diagram is present inside the panel. The connections outside the generator must be carried out by
Qualified Personnel
in
compliance with the Technical Standards and with the local National Legislation in force in the country of use.
m
IMPORTANT
–
Connect the generator to an efficient earthing system.
ICI CALDAIE S.p.A.
is not liable for any damage caused by the
lack of earthing and failure to comply with the wiring diagram.
–
Check that the panel power supply complies with the wiring diagram supplied.
–
Make sure the generator is properly earthed.
–
Check the plant’s electrical system.
d
PROHIBITION
–
Do not use the water and heating system pipes for the
earthing connections
.
–
Do not step on or damage the protective sheath of the cable with any other mean.
Содержание ECOVAPOR Series
Страница 78: ...Appendixes for Technical Personnel 78...
Страница 79: ...Appendixes for Technical Personnel 79...