POST
and
Boot
specifications
The
M12
performs
a
POST
by
default
each
time
that
you
power
on
(cold
boot)
or
restart
or
reset
the
chassis.
You
can
restart
the
M12
with
the
switchreboot
command,
the
reboot
command,
or
the
fastboot
command.
The
fastboot
command
restarts
the
switches
without
running
POST.
If
you
restart
the
active
CP
card,
it
fails
over
to
the
standby
CP
card.
Monitoring
POST
results
You
can
monitor
the
success
and
failure
of
the
diagnostic
tests
that
are
run
during
POST
through
LED
activity,
the
error
log,
or
a
command
line
interface.
POST
requires
a
minimum
of
3
minutes
to
complete,
however
the
time
might
vary
depending
on
the
devices
that
are
connected
to
the
M12.
POST
performs
the
following
steps:
1.
Runs
preliminary
POST
diagnostics
2.
Initializes
the
operating
system
3.
Initializes
the
hardware
4.
Runs
diagnostic
tests
on
several
functions,
including
circuitry,
port
functionality,
ability
to
send
and
receive
frames,
all
aspects
of
memory,
parity,
statistics
counters,
and
serialization
Boot
Boot
completes
in
a
minimum
of
3
minutes
if
you
run
a
POST.
In
addition
to
POST,
boot
includes
the
following
steps
after
the
POST
completes:
1.
Configures
the
universal
port
2.
Initializes
the
links
3.
Analyzes
the
fabric.
If
any
ports
are
connected
to
other
switches,
the
switch
participates
in
a
fabric
configuration.
4.
Obtains
a
domain
ID
for
the
switch
and
assigns
port
addresses
5.
Constructs
unicast
routing
tables
6.
Enables
normal
port
operation
Appendix
A.
Product
specifications
93
Содержание TotalStorage 2109 M12
Страница 2: ......
Страница 3: ...IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide GC26 7633 00...
Страница 8: ...Glossary 105 Index 119 vi IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...
Страница 10: ...viii IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...
Страница 12: ...x IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...
Страница 30: ...xxviii IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...
Страница 36: ...6 IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...
Страница 44: ...14 IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...
Страница 62: ...32 IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...
Страница 68: ...38 IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...
Страница 86: ...56 IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...
Страница 114: ...84 IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...
Страница 124: ...94 IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...
Страница 126: ...96 IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...
Страница 157: ......
Страница 158: ...Part Number 17P7363 Printed in USA GC26 7633 00 1P P N 17P7363...
Страница 159: ...Spine information IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...