Power-off
procedure
Perform
the
following
steps
to
power
off
the
switch:
1.
Open
the
rear
door
of
the
cabinet.
Check
the
power
cabling
from
the
M12
that
is
attached
to
the
PDU
that
you
are
servicing.
These
switches
have
dual
power
cords
and
are
plugged
into
PDUs
with
independent
ac
sources.
2.
Removing
power
to
a
mounted
M12
has
an
adverse
affect
on
the
customer’s
systems
and
networks
if
they
are
not
properly
prepared.
Inform
the
customer
before
you
power
off
the
M12.
Before
you
power
off
switches,
make
sure
that
the
customer
has
removed,
dismounted,
or
taken
them
offline
from
their
systems.
3.
Turn
off
the
ac
power
switches
(circuit
breaker)
to
the
M12
that
are
connected
to
the
PDU
that
you
are
servicing.
4.
Unplug
the
power
cord
from
the
customer’s
ac
power
outlet.
5.
Unplug
all
power
cords
from
the
PDU
that
you
are
servicing.
Removing
and
replacing
a
16–port
card
or
filler
panel
Use
this
procedure
to
remove
and
replace
a
16–port
card
or
filler
panel.
The
switch
can
continue
to
operate
during
this
procedure.
However,
if
you
are
removing
a
16–port
card,
any
cables
that
are
connected
to
that
16–port
card
must
be
disconnected.
You
can
notify
the
switch
of
a
hot-swap
request
in
two
ways.
You
can
either
run
the
slotPowerOff
and
slotPowerOn
commands,
or
click
the
ejector
handles
on
the
16–port
card.
Attention:
Do
not
remove
the
16–port
card
during
diagnostic
tests.
Wait
for
the
status
LED
to
turn
off
in
response
to
the
hot-swap
request
before
you
remove
a
16–port
card.
Attention:
No
user-serviceable
parts
are
inside
the
16–port
card
or
filler
panel.
Disassembling
any
part
of
a
16–port
card
or
filler
panel
voids
the
part
warranty
and
regulatory
certifications.
Attention:
To
ensure
correct
cooling
of
the
chassis
and
protection
from
dust,
install
a
filler
panel
in
any
empty
slots.
Time
required
Approximately
10
minutes
or
less
Removing
a
16–port
card
or
filler
panel
Attention:
Wear
a
grounded
ESD
strap
when
handling
a
16–port
card.
The
chassis
has
a
grounding
connection
above
the
power
connectors.
Hold
the
16–port
card
by
the
edges
of
the
metal
pan
(do
not
hold
by
ejectors).
Note:
If
you
are
replacing
multiple
cards,
replace
one
card
at
a
time.
Before
you
replace
a
port
card,
determine
if
it
is
the
entire
card
or
the
SFPs
that
are
faulty.
Perform
the
following
steps
to
remove
a
16–port
card:
Chapter
6.
Servicing
the
M12
59
Содержание TotalStorage 2109 M12
Страница 2: ......
Страница 3: ...IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide GC26 7633 00...
Страница 8: ...Glossary 105 Index 119 vi IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...
Страница 10: ...viii IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...
Страница 12: ...x IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...
Страница 30: ...xxviii IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...
Страница 36: ...6 IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...
Страница 44: ...14 IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...
Страница 62: ...32 IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...
Страница 68: ...38 IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...
Страница 86: ...56 IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...
Страница 114: ...84 IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...
Страница 124: ...94 IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...
Страница 126: ...96 IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...
Страница 157: ......
Страница 158: ...Part Number 17P7363 Printed in USA GC26 7633 00 1P P N 17P7363...
Страница 159: ...Spine information IBM TotalStorage SAN Switch 2109 Model M12 Installation and Service Guide...