Operator Panel Display Numbers
E-1
Appendix E. Operator Panel Display Numbers
This appendix contains lists of the various numbers and characters that may be displayed in
the three-digit display. The numbers and characters are divided into two broad categories.
The first grouping is those that track power-on testing of the system unit; the second group
provides information about messages that follow a
flashing
888
number.
To form an SRN from any
steady number that occurs during system power-on test (PON or
POST), add 101- in front of the displayed number.
For more detailed explanations of three-digit display numbers, refer to the
AIX Problem
Solving Guide and Reference.
Power-On (PON) Test Indicators
100
PON completed successfully; control was passed to IPL ROS.
101
PON started following Reset.
102
PON started following power-on Reset.
103
PON could not determine the system model number.
104
Equipment conflict; PON could not find the CBA.
105
PON could not read from the OCS EPROM.
106
PON failed: CBA not found
111
OCS stopped; PON detected a module error.
112
A checkstop occurred during PON; checkstop results could not be logged
out.
113
Three checkstops have occurred.
120
PON starting a CRC check on the 8752 EPROM.
121
PON detected a bad CRC in the first 32K bytes of the OCS EPROM.
122
PON started a CRC check on the first 32K bytes of the OCS EPROM.
123
PON detected a bad CRC on the OCS area of NVRAM.
124
PON started a CRC check on the OCS area of NVRAM.
125
PON detected a bad CRC on the time-of-day area of NVRAM.
126
PON started a CRC check on the time-of-day area of NVRAM.
127
PON detected a bad CRC on the 8752 EPROM.
130
PON presence test started.
140
Running PON. (Box Manufacturing Mode Only)
142
Box manufacturing mode operation.
143
Invalid memory configuration.
144
Manufacturing test failure.
151
PON started AIPGM test code.
152
PON started DCLST test code.
153
PON started ACLST test code.
154
PON started AST test code.
160
Bad EPOW Signal/Power status signal.
161
PON being conducted on BUMP I/O
162
PON being conducted on JTAG
163
PON being conducted on Direct I/O
164
PON being conducted on CPU
165
PON being conducted on DCB and Memory
166
PON being conducted on Interrupts
170
PON being conducted on Multiprocessors
180
Logout in progress.
Содержание ThinkPad R30
Страница 1: ...7015 Models R30 R40 and R50 CPU Enclosure Operator Guide...
Страница 12: ...xii Operator Guide...
Страница 16: ...xvi Operator Guide...
Страница 20: ...1 4 Operator Guide...
Страница 132: ...4 10 Operator Guide AC Rack Cables and the CPU Enclosure Connectors CPU Enclosure...
Страница 156: ...6 4...
Страница 194: ...10 4 Operator Guide...
Страница 238: ...B 8 Operator Guide...
Страница 248: ...D 4 Operator Guide...