Figure 458. Removing a cable clip
f) Label and unplug the SMP cables for the system node that you are servicing.
Attention: Do not drop or damage the metal connectors on the cable. If the metal
connectors are bent or damaged, they need to be replaced.
1) Slightly push in the cable bundle (A) as shown in the following figure, to relieve the spring
pressure of the cable connector.
2) Pull the blue latch (B) as shown in the following figure to release the inner cable latch
3) Remove the SMP cable (C) from the system node.
Processor VRM 527
Содержание 9080-M9S
Страница 1: ...Power Systems Removing and replacing parts in the 9080 M9S system IBM ...
Страница 19: ...Figure 11 Identify LEDs for the service processor cables on the system node Cables 13 ...
Страница 25: ...Figure 17 Service processor FSP cabling Cables 19 ...
Страница 51: ...Figure 37 Identify LEDs for the UPIC cables on the system node Cables 45 ...
Страница 70: ...64 Power Systems Removing and replacing parts in the 9080 M9S system ...
Страница 82: ...76 Power Systems Removing and replacing parts in the 9080 M9S system ...
Страница 85: ...Figure 70 Replacing the concurrent maintenance circuit card Concurrent maintenance circuit card 79 ...
Страница 86: ...80 Power Systems Removing and replacing parts in the 9080 M9S system ...
Страница 92: ...86 Power Systems Removing and replacing parts in the 9080 M9S system ...
Страница 137: ...Figure 111 Cabling a Four Node Configuration Memory modules 131 ...
Страница 149: ...Figure 121 Service processor FSP cabling Memory modules 143 ...
Страница 157: ...Figure 130 Removing the rear power cords L003 or or Memory modules 151 ...
Страница 182: ...Figure 151 Cabling a Four Node Configuration 176 Power Systems Removing and replacing parts in the 9080 M9S system ...
Страница 194: ...Figure 161 Service processor FSP cabling 188 Power Systems Removing and replacing parts in the 9080 M9S system ...
Страница 203: ...Figure 170 Removing the rear power cords L003 or or Memory modules 197 ...
Страница 228: ...Figure 191 Cabling a Four Node Configuration 222 Power Systems Removing and replacing parts in the 9080 M9S system ...
Страница 240: ...Figure 201 Service processor FSP cabling 234 Power Systems Removing and replacing parts in the 9080 M9S system ...
Страница 250: ... L003 or or or or 244 Power Systems Removing and replacing parts in the 9080 M9S system ...
Страница 275: ...Figure 231 Cabling a Four Node Configuration Memory VRMs 269 ...
Страница 287: ...Figure 241 Service processor FSP cabling Memory VRMs 281 ...
Страница 294: ...288 Power Systems Removing and replacing parts in the 9080 M9S system ...
Страница 298: ... L003 or or or or 292 Power Systems Removing and replacing parts in the 9080 M9S system ...
Страница 323: ...Figure 271 Cabling a Four Node Configuration Miscellaneous VRMs 317 ...
Страница 335: ...Figure 281 Service processor FSP cabling Miscellaneous VRMs 329 ...
Страница 369: ...Figure 311 Cabling a Four Node Configuration Miscellaneous VRMs 363 ...
Страница 381: ...Figure 321 Service processor FSP cabling Miscellaneous VRMs 375 ...
Страница 388: ...382 Power Systems Removing and replacing parts in the 9080 M9S system ...
Страница 404: ...398 Power Systems Removing and replacing parts in the 9080 M9S system ...
Страница 434: ...428 Power Systems Removing and replacing parts in the 9080 M9S system ...
Страница 503: ...Figure 433 Replacing the Power APSS and TPM card Power APSS and trusted platform module card 497 ...
Страница 504: ...498 Power Systems Removing and replacing parts in the 9080 M9S system ...
Страница 510: ...504 Power Systems Removing and replacing parts in the 9080 M9S system ...
Страница 523: ...Figure 451 Installing the front cover 9 If applicable close the rack front door Power supplies 517 ...
Страница 524: ...518 Power Systems Removing and replacing parts in the 9080 M9S system ...
Страница 528: ... L003 or or or or 522 Power Systems Removing and replacing parts in the 9080 M9S system ...
Страница 553: ...Figure 475 Cabling a Four Node Configuration Processor VRM 547 ...
Страница 565: ...Figure 485 Service processor FSP cabling Processor VRM 559 ...
Страница 572: ...566 Power Systems Removing and replacing parts in the 9080 M9S system ...
Страница 592: ...586 Power Systems Removing and replacing parts in the 9080 M9S system ...
Страница 634: ...628 Power Systems Removing and replacing parts in the 9080 M9S system ...
Страница 637: ...Figure 552 Removing the rear power cords L003 or or System processor module 631 ...
Страница 681: ...Figure 592 Cabling a Four Node Configuration System processor module 675 ...
Страница 693: ...Figure 602 Service processor FSP cabling System processor module 687 ...
Страница 729: ......
Страница 730: ...IBM ...