# mmgetstate -N this ESS 3000 nodeclass
b. Do the following extra steps on canister B, if MES is for EC64 (InfiniBand):
i) Update the
verbsPorts
list, first start GPFS manually.
ii) Ensure that correct entries are listed in
verbsPorts
for the target node class by issuing the
following command:
/opt/ibm/ess/tools/samples/essServerConfig.sh node class name
# mmlsconfig -Y | grep -i verbsPort
Example:
[root@ess3k5a ~]# mmlsconfig -Y | grep -i verbsPort
mmlsconfig::0:1:::verbsPorts:mlx5_1/1::
mmlsconfig::0:1:::verbsPorts:mlx5_0/1 mlx5_1/1:bodhi1-ib,gssio2-ib,bodhi_nc1,ems:
mmlsconfig::0:1:::verbsPorts:mlx5_0/1 mlx5_1/1 mlx5_2/1 mlx5_3/1:ess_x86_64:
mmlsconfig::0:1:::verbsPorts:mlx5_2/1 mlx5_3/1 mlx5_4/1 mlx5_5/1:ess_x86_64_mmvdisk_5:
mmlsconfig::0:1:::verbsPorts:mlx5_2/1 mlx5_3/1:ess_x86_64_mmvdisk_6:
mmlsconfig::0:1:::verbsPorts:mlx5_0/1:gss_ppc64:
18. Mount file systems on canister B again. (Customer task)
a. Check mounted file systems and mount to canister B again, if necessary.
# mmlsmount fs1 -L
or
# mmlsmount all -L
b. Move the quorum node back to the original state, if necessary.
ESS 3000 adapter MES upgrade: AJP1
This procedure is intended for the concurrent (online) adapter MES installation to add the third adapter to
each of the server canisters of ESS 3000. The adapter option is AJP1 (VPI).
While the adapter MES is designed to be a concurrent procedure, it is recommended to perform this
procedure during a service window of low activity.
Prerequisites
• ESS 3000 6.0.1.1
• Existing adapters that are installed in the system are VPI
Objectives
• Install the new adapter pair, one in each server canister, by using an online process.
• Incorporate the new interfaces into an existing single master bond.
High-level MES upgrade steps
1. Prepare canister A (bottom canister slot) for adapter MES.
2. Unmount file systems mounted on canister A.
3. Shut down GPFS only in canister A.
4. Remove canister A from the enclosure.
5. Install the hardware - add one adapter to the available middle slot in canister A.
6. Reinsert canister A into enclosure and do basic checks.
Chapter 2. Servicing 37
Содержание 3000 6.0.2
Страница 1: ...IBM Elastic Storage System 3000 6 0 2 Service Guide IBM SC28 3187 01...
Страница 4: ...Index 71 Index 71 iv...
Страница 6: ...vi...
Страница 8: ...viii...
Страница 12: ...xii IBM Elastic Storage System 3000 Service Guide...
Страница 30: ...18 IBM Elastic Storage System 3000 Service Guide...
Страница 66: ...54 IBM Elastic Storage System 3000 Service Guide...
Страница 72: ...60 IBM Elastic Storage System 3000 Service Guide...
Страница 82: ...70 IBM Elastic Storage System 3000 Service Guide...
Страница 84: ...72 IBM Elastic Storage System 3000 Service Guide...
Страница 86: ...74 IBM Elastic Storage System 3000 Service Guide...
Страница 87: ......
Страница 88: ...IBM Product Number 5765 DME 5765 DAE SC28 3187 01...