5-83
Contact (A/S phone number)
⑤
Machine Information
④
This can confirm the identification of the model information (ECU), MCU, monitor, switch
controller, RMCU, relay driver unit, FATC (air conditioner controller), AAVM (opt).
·
Enter the new A/S phone number
290F3CD144
290F3CD145
290F3CD146
290F3CD147
290F3CD148
290F3CD149
290F3CD250
290F3CD151
Service menu
⑥
Power shift (standard/option) : Power shift pressure can be set by option menu.
Operating hours : Operating hours since the machine line out can be checked by this menu.
Breaker mode pump acting (1 pump/2 pump)
EPPR current level (attach flow EPPR 1 & 2, boom priority EPPR, attach relief pressure EPPR
1& 2)
Overload pressure : 100 ~ 350 bar
·
·
·
·
·
290F3CD152
290F3CD153
Clinometer
⑦
When the machine is on the flatland, if tap the "initialization", the values of X, Y reset "0".
You can confirm tilt of machine in cluster's operating screen.
·
·
Содержание HX130 LCR
Страница 11: ...1 1 SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10 ...
Страница 174: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV ...
Страница 218: ...4 49 4 49 No of pin Receptacle connector female Plug connector male 14 1 7 6 14 MG610406 KET SDL CONNECTOR 13 ...
Страница 517: ...8 89 Insert O rings to the relief valve 30 and reassemble them to rear cover 20 This completes assembly 17 32038SM42 ...
Страница 536: ...8 108 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29 ...
Страница 545: ...8 117 125LCR8TM61 After assembling spring 44 in order clamp plug 41 Tightening torque 5 5 0 5 kgf m 39 8 3 6 lbf ft 31 ...
Страница 566: ...8 138 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10 ...
Страница 577: ...8 149 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10 ...
Страница 609: ...8 181 1 STRUCTURE GROUP 11 WORK EQUIPMENT SECTION C SECTION B SECTION A 130ZF8DA44 SECTION A SECTION B SECTION C ...