6-62
TEST PROCEDURE
Test 16 : Check voltage at CN-52 (19)
and ground.
Prepare 1 piece of thin sharp pin, steel or
copper.
Insert prepared pin to rear side of
connectors : One pin to (19) of CN-52.
Starting switch ON.
Check voltage as figure.
MCU
CN-51
CN-52
Female
CN-52
1
2
3
4
5
6
7
8
9
10
31
32
33
34
36
37
38
39
40
11
21
20
30
Multimeter
GROUND
PIN
19
(1)
①
②
③
④
2)
SPEC : Actuator operating : 1~5 V
300L6MS20
Содержание HX130 LCR
Страница 11: ...1 1 SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10 ...
Страница 174: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV ...
Страница 218: ...4 49 4 49 No of pin Receptacle connector female Plug connector male 14 1 7 6 14 MG610406 KET SDL CONNECTOR 13 ...
Страница 517: ...8 89 Insert O rings to the relief valve 30 and reassemble them to rear cover 20 This completes assembly 17 32038SM42 ...
Страница 536: ...8 108 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29 ...
Страница 545: ...8 117 125LCR8TM61 After assembling spring 44 in order clamp plug 41 Tightening torque 5 5 0 5 kgf m 39 8 3 6 lbf ft 31 ...
Страница 566: ...8 138 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10 ...
Страница 577: ...8 149 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10 ...
Страница 609: ...8 181 1 STRUCTURE GROUP 11 WORK EQUIPMENT SECTION C SECTION B SECTION A 130ZF8DA44 SECTION A SECTION B SECTION C ...