4-25
Part name
Symbol
Specifications
Check
Switch
(DPF)
24V
※
Check contact
Normal
Ⅰ
: 0
Ω
(for terminal 6-10)
0 :
∞Ω
(for terminal 6-4, 6-10)
Ⅱ
:
∞Ω
(for terminal 6-10)
Head lamp,
Work lamp,
Cab lamp
24V 65W
(H3 Type)
※
Check disconnection
Normal : 1.2
Ω
Beacon lamp
24V
70W (H1 Type)
2.4W (LED Type)
※
Check disconnection
Normal : A few
Ω
Fuel filler pump
24V 10A
35
ℓ
/min
※
Check resistance
Normal : 1.0
Ω
Fuel feed pump
24V
-
Hour meter
16~32V
※
Check operation
Supply power(24V) to terminal
No.2 and connect terminal No.1 and
ground
4-25
CL-3
1
2
CL-4 CL-5 CL-6
CL-8 CL-9 CL-10
1
2
M
CN-61
CN-145
1
2
M
M
CL
-
CL-7
h
3
2
1
CN-48
7
6
3
9
0
1
2
4
10
12
11
10
9
8
7
6
5
4
3
11
12
CS-100
Содержание HX130 LCR
Страница 11: ...1 1 SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10 ...
Страница 174: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV ...
Страница 218: ...4 49 4 49 No of pin Receptacle connector female Plug connector male 14 1 7 6 14 MG610406 KET SDL CONNECTOR 13 ...
Страница 517: ...8 89 Insert O rings to the relief valve 30 and reassemble them to rear cover 20 This completes assembly 17 32038SM42 ...
Страница 536: ...8 108 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29 ...
Страница 545: ...8 117 125LCR8TM61 After assembling spring 44 in order clamp plug 41 Tightening torque 5 5 0 5 kgf m 39 8 3 6 lbf ft 31 ...
Страница 566: ...8 138 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10 ...
Страница 577: ...8 149 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10 ...
Страница 609: ...8 181 1 STRUCTURE GROUP 11 WORK EQUIPMENT SECTION C SECTION B SECTION A 130ZF8DA44 SECTION A SECTION B SECTION C ...