
2-32
BUCKET OUT OPERATION
During the bucket out operation, the pilot secondary pressure from RCV is supplied to port Pb5
of the spring opposite side and shifts the bucket spool in the right direction.
The bypass passage is shut off by the movement of the bucket spool and the hydraulic fluid from
pump A2 entered P1 parallel passage and is directed to the port B5 through the check 1.
At the same time, the hydraulic fluid from P1 bypass passage is directed to the port B5 through
the check 2.
The return flow from the head side of the bucket cylinder returns to the hydraulic oil tank through
the port A5 and the tank passage.
(2)
Bucket limiter
B5
A5
P1 Bypass passage
P1 Parallel passage
Check 2
Bucket spool
Tank passage
Check 1
From RCV
Pb5
130ZF2MC35
Содержание HX130 LCR
Страница 11: ...1 1 SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10 ...
Страница 174: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV ...
Страница 218: ...4 49 4 49 No of pin Receptacle connector female Plug connector male 14 1 7 6 14 MG610406 KET SDL CONNECTOR 13 ...
Страница 517: ...8 89 Insert O rings to the relief valve 30 and reassemble them to rear cover 20 This completes assembly 17 32038SM42 ...
Страница 536: ...8 108 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29 ...
Страница 545: ...8 117 125LCR8TM61 After assembling spring 44 in order clamp plug 41 Tightening torque 5 5 0 5 kgf m 39 8 3 6 lbf ft 31 ...
Страница 566: ...8 138 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10 ...
Страница 577: ...8 149 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10 ...
Страница 609: ...8 181 1 STRUCTURE GROUP 11 WORK EQUIPMENT SECTION C SECTION B SECTION A 130ZF8DA44 SECTION A SECTION B SECTION C ...