
2-50
STRUCTURE (TYPE 2)
Swing device consists swing motor, swing reduction gear.
Swing motor include mechanical parking valve, relief valve, make up valve and time delay valve.
B
A
R/G Air bleed port(PT 1/4)
R/G Oil drain port(PT 1/2)
R/G grease fill port(PT 1/4)
Au
SH
PG
GB
B
Mu
Dr
GA
A
GA
Dr
Mu
GB
PG
SH
PG
SH
Relief valve
Time delay valve
Swing motor
Reduction gear
Oil level gauge &
Oil supply port
Hydraulic circuit
Au
130ZF2SM01
Port
Port name
Port size
A
Main port
Ø
13
B
Main port
Ø
13
Dr
Drain port
PF 3/8
Mu
Make up port
PF 3/4
PG
Brake release stand by port
PF 1/4
SH
Brake release pilot port
PF 1/4
GA, GB Gauge port
PF 1/4
Au
Air vent port
PF 1/4
Содержание HX130 LCR
Страница 11: ...1 1 SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10 ...
Страница 174: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV ...
Страница 218: ...4 49 4 49 No of pin Receptacle connector female Plug connector male 14 1 7 6 14 MG610406 KET SDL CONNECTOR 13 ...
Страница 517: ...8 89 Insert O rings to the relief valve 30 and reassemble them to rear cover 20 This completes assembly 17 32038SM42 ...
Страница 536: ...8 108 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29 ...
Страница 545: ...8 117 125LCR8TM61 After assembling spring 44 in order clamp plug 41 Tightening torque 5 5 0 5 kgf m 39 8 3 6 lbf ft 31 ...
Страница 566: ...8 138 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10 ...
Страница 577: ...8 149 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10 ...
Страница 609: ...8 181 1 STRUCTURE GROUP 11 WORK EQUIPMENT SECTION C SECTION B SECTION A 130ZF8DA44 SECTION A SECTION B SECTION C ...