
3-8
Dr5
RIGHT
LEFT
TRAVEL
STRAIGHT
TRAVEL
TRAVEL
BOOM 1
SWING
BOOM 2
ARM 1
OPTION B
OPTION C
(DOZER)
ARM
BUCKET
ARM 2
REGEN
Pu
P1
P2
P3
Pd0
Dr3
Po5
P1
A3
A2
A1
A1
T5
T4
T3
T2
T1
P5
P1
P4
P3
P2
A4
P3
P2
(MCV)
P03
(MCV)
Pb4
(MCV)
Pu
(T/Joint)
P
Dr4
Pa4
P(F/CNTL
EPPR)
PG(S/Motor)
P02(MCV)
P0(MCV)
T
Pc42
Pb3
Pd41
B2
A2
Pb1
A1
B1
Pa1
T1
V3
Pd2
Pc2
D2
C2
Pc1
D1
C1
P0
DR0
Pd1
Ai
B4
B5
A5
Pa5
Pb5
Pa4
Pb4
C5
D5
D4
C4
Pc41
Pc5
Pd5
Rs
C6
Pd6
Pc6
D6
DR4
P03
Patt
P02
Pn2
Pn1
Po5
Puo
P04
DR2
Pc3
Pa21
Pb21
Pb20
Pa20
DR1
DR5
DR3
Pc40
Pd40
PS
PS
Pi1(Pump)
Dr#, dr#
Pi2(Pump)
(3)
(1)
(2)
(4)
(3)
(1)
P
T
P
T
(2)
(4)
a
b
d
f
h
j
c
d1
B e1 D
A
E
F
G
H
J
g
e
e2
SWING
ARM
BUCKET
BOOM
PS
PS
PS
PS
h1
h2
Pd40 Pd41
Pc2
Pd2
SH
Pc3
(3)
(4)
(1)
(2)
P
T
TRAVEL
Pc1
Pd1
Pa1
Pb1
Pb5
Pa5
Pb3
Pc40
Pc41
Pc42
P04
Pa20 Pa21
Pb20 Pb21
ARM
CYLINDER
BUCKET
CYLINDER
BOOM
CYLINDER
TURNING
JOINT
TRAVEL MOTOR
SWING MOTOR
BOOM PRIORITY
EPPR VALVE
Boom speed
HYDRAULIC TANK
PILOT
PUMP
A1
PUMP
A2
PUMP
When carrying out the combined operation of swing and boom up, the boom up operating speed is
lowered then normal operation.
To increase working efficiency, swing speed reducing system is used.
The pilot oil from pilot pump flow into P03 port in main control valve through boom priority EPPR
valve. P03 oil pressure moves swing reducing spool to lower position and oil flow rate to the swing
motor decreased.
Then, the boom up speed is increased. This is called the boom priority system.
The boom up speed can be adjusted by the cluster. Refer to page 3-20 of the operator's manual.
130ZF3HC04
3. BOOM PRIORITY SYSTEM
Содержание HX130 LCR
Страница 11: ...1 1 SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10 ...
Страница 174: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV ...
Страница 218: ...4 49 4 49 No of pin Receptacle connector female Plug connector male 14 1 7 6 14 MG610406 KET SDL CONNECTOR 13 ...
Страница 517: ...8 89 Insert O rings to the relief valve 30 and reassemble them to rear cover 20 This completes assembly 17 32038SM42 ...
Страница 536: ...8 108 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29 ...
Страница 545: ...8 117 125LCR8TM61 After assembling spring 44 in order clamp plug 41 Tightening torque 5 5 0 5 kgf m 39 8 3 6 lbf ft 31 ...
Страница 566: ...8 138 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10 ...
Страница 577: ...8 149 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10 ...
Страница 609: ...8 181 1 STRUCTURE GROUP 11 WORK EQUIPMENT SECTION C SECTION B SECTION A 130ZF8DA44 SECTION A SECTION B SECTION C ...