OPERATION
tivate and
water should begin flowing. Allow pump to run until all air is purged from the unit
unit should illuminate.
tion (Indicator will light
l
nce air is purged from the system (pressure
sired
lied.
1.
2.
s Fill/Drain
ssure switch
4.
pplied.
.
ss the Fill/Drain button once. After the unit is drained press On/Off button
once to insure that no inadvertent filling or draining can take place.
Operating considerations for BES standalone (option A):
1. For initial start up turn thermostat all the way down and fill tub.
2. Insure that tub has water above highest return and open bleed valve on face of pump
to bleed air from system.
. Turn thermostat DOWN and turn on system power, the pump should ac
3
4. Turn the thermostat UP, the heat light on the front of the BES
. Insure pressure switch is properly adjusted to allow heat func
5
for heat).
6. Before draining insure that power has been removed from the control.
Operating considerations for BES with Auto Fill (option B):
1. Insure that SYSTEM INTERFACE MODULE (DRAIN/FILL CONTROL) option contro
is securely plugged into BES receptacle. Install air tubing and air button on the
On/Off air switch nipple.
2. Set thermostat all the way down and apply power to unit. If fill valve does not open
and begin filling the tub then press the air button supplied one time.
3. Once the unit is full the fill valve will automatically close, the pump will engage and
the unit should be ready for heating o
switch may require some adjustment).
. Turn the thermostat knob clockwise until the heat engages and set for de
4
temperature. The pump will continue to run as long as tub is full and power is app
5. Before draining unit insure that the auto fill has been deselected (press button once)
or that power is removed from BES.
Operating considerations for BES with Auto Fill/Auto Drain (option C):
Insure that SYSTEM INTERFACE MODULE (DRAIN/FILL CONTROL) option is
securely plugged into matching receptacle and that Auto-Drain valve cord is installed.
Install one set of air tubing and air button on the On/Off air switch nipple on the
control system and one set on the Fill/Drain air switch nipple on the Interface Module.
Set the thermostat all the way down and apply power to unit. If neither drain nor fill
valves actuate press On/Off button once. If drain valve starts to open pres
button once after valve reaches full open. Once Fill/Drain is in the correct position the
drain valve should close and the fill valve should open filling the tub.
3. Once the tub is full the fill valve will automatically close, the pump will engage and the
nit should be ready for heating once air is purged from the system (pre
u
may require some adjustment).
Turn the thermostat clockwise until the heat engages and set for desired
temperature. The pump will continue to run as long as tub is full and power is a
To drain pre
5
***Once Fill or Drain is selected you must allow drain valve to travel completely
before switching back or the actuator may stick half way requiring power to be
recycled***
85-0130 REV.10
5/11
16
Содержание BES6000-HC Series
Страница 9: ...BES COMPONENT CONNECTIONS 85 0130 REV 10 5 11 8...
Страница 10: ...FLOAT SWITCH LEVEL KIT PLUMBING DIAGRAM 85 0130 REV 10 5 11 9...
Страница 11: ...PRESSURE SWITCH LEVEL KIT PLUMBING DIAGRAM 85 0130 REV 10 5 11 10...
Страница 12: ...SYSTEM INTERFACE MODULE SEE NEXT PAGE FOR IMPORTANT TIPS 85 0130 REV 10 5 11 11...
Страница 22: ...85 0130 REV 10 5 11 21...