background image

R2GC 200, R2GC 250, R2GC 300, R2GC 400

STORAGE WATER HEATERS

EN

v. 1.1

Users Manual

Date of manufacture: ...................................

Serial number: .............................................

Checked by: ................................................

Содержание R2GC 250

Страница 1: ...R2GC 200 R2GC 250 R2GC 300 R2GC 400 STORAGE WATER HEATERS EN v 1 1 Users Manual Date of manufacture Serial number Checked by...

Страница 2: ...3 Technical Data and Dimensions of R2GC Tanks 4 4 Operation 5 5 Examples of Assigning Connection Points 5 6 Installation and Commissioning 7 6 1 Connection to heat sources 7 6 2 Connection to a solar...

Страница 3: ...d it guarantees a long serv ice life The magnesium anode rod shall be inspected regularly see point 7 Maintenance Replacement of Magnesium Anode Rod An electronic anode can be also used its lifetime c...

Страница 4: ...5 upper heating coil kW 24 2 34 6 38 1 45 Flow rate l h 600 850 940 1110 Heating water needed m3 h 2 7 2 85 3 0 3 0 h1 mm 210 130 210 240 h2 mm 290 210 290 320 h3 mm 400 355 440 570 h4 mm 570 520 580...

Страница 5: ...ystem R2GC HW CW recirculation E E gas boiler T bb bb bbb bbb B bbb bbb Conn point Example I with a gas boiler Example II with a boiler and accum tank G 5 4 upper flange magnesium anode magnesium anod...

Страница 6: ...solar system and accumulation tank boiler PS R2GC HW CW recirculation E E T bb bb bbb bbb B bbb bbb Table of limit values for total dissolved solids in hot water Description pH Total dissolved solids...

Страница 7: ...d to connect the tank to a cold water inlet and hot water outlet A 6bar safety valve shall be installed at the cold water inlet installa tion of a reducing valve is recommended If the pressure from wa...

Страница 8: ...n anti corrosion sacrifice magnesium anode rod The anode rod shall be checked within 6 months after commissioning and subsequently always not later than 6 months after the last check If more than 1 3...

Отзывы: