Performing inspection / maintenance
2. Select the tank to be filled.
Owing to its design, the level
sensor in the reservoir does cover the
bottom. As a result, the CTU software
will still show a content of 1 liter.
3. Pour the previously determined and
measured test liquid into the analysis
chamber of the CTU.
Max. capacity is approx. 20
liters.
4. Then start the suction of the test liquid in
the CTU software. The added test liquid
is suctioned into the pre-selected tank
B1
or
B2
.
5. Wait until the test liquid is completely
suctioned out.
Stop the "Fill system" process by
pressing the stop key.
6. The filling of the system is completed.
CTU 1000 Series
en(us)
Page 74 / 92
BeWa CTU1000 3229578p en-us 2017-04-25.doc
2017-04-25
Содержание CTU 1000 Series
Страница 17: ...Transporting the CTU CTU 1000 Series en us Page 17 92 BeWa CTU1000 3229578p en us 2017 04 25 doc 2017 04 25 ...
Страница 89: ......
Страница 90: ......
Страница 91: ......