Performing inspection / maintenance
Change the test liquid
1 month
Replace gloves
6 months
Maintenance intervals for CTU 1xx1
with A III cleaner as the test liquid
Replace hoses
2 years
Change the fine filter for the test liquid
12 months
Change return filters
12 months
Calibrating the flow rate meter
X
Calibrate the temperature sensor (ultrasound
option only)
X
Clean the analysis chamber
X
Cleaning the diffuser for the filter membrane
holder
X
Change the test liquid
X
1 month
Maintenance intervals for CTU 1xx1
with water as the test liquid
Replace hoses
2 years
Change the fine filter for the test liquid
3 months
Change return filters
3 months
Calibrate the volume flow meter
X
Calibrate the temperature sensor (ultrasound
option only)
X
Clean the analysis chamber
Daily
Cleaning the diffuser for the filter membrane
holder
X
Change the test liquid
X
Replace hoses
The installed hoses are specially designed for use with the test liquid. The
hoses must be checked regularly for brittleness.
After 2 years replace the hoses.
CTU 1000 Series
en(us)
Page 60 / 92
BeWa CTU1000 3229578p en-us 2017-04-25.doc
2017-04-25
Содержание CTU 1000 Series
Страница 17: ...Transporting the CTU CTU 1000 Series en us Page 17 92 BeWa CTU1000 3229578p en us 2017 04 25 doc 2017 04 25 ...
Страница 89: ......
Страница 90: ......
Страница 91: ......