Performing inspection / maintenance
15. The element replacement process is
complete.
Calibrating the test liquid meter
Calibrate the quantity counter annually by gauging. To do so, proceed as
follows:
1.
On the filter regulator, set the rinsing pressure to 2 bar.
2.
Start a contamination test in the CTU software with a rinsing volume
of 5 liters.
3.
Start a contamination test in the CTU software with a rinsing volume
of 5 liters.
4.
Fill the measuring beaker using the hand piece (nozzle) of the CTU
by operating the foot switch until the set volume has been
completely discharged.
5.
Read the volume on the measuring beaker. A deviation of +/- 5%
(4.75 liters … 5.25 liters) is within the tolerance.
If the deviation is larger, the meter has to be adjusted. Contact the
HYDAC Service Department.
6.
The calibration by gauging is completed.
Calibrating the temperature sensor (ultrasound option only)
Calibrate the temperature feeler for the ultrasound bath annually. Contact the
HYDAC service department for this purpose.
Cleaning the analysis chamber
Clean the analysis chamber of the CTU1xx0 every week or the CTU1xx1
daily. For cleaning, we recommend a clean microfiber cloth.
CTU 1000 Series
en(us)
Page 68 / 92
BeWa CTU1000 3229578p en-us 2017-04-25.doc
2017-04-25
Содержание CTU 1000 Series
Страница 17: ...Transporting the CTU CTU 1000 Series en us Page 17 92 BeWa CTU1000 3229578p en us 2017 04 25 doc 2017 04 25 ...
Страница 89: ......
Страница 90: ......
Страница 91: ......