
Installation and Maintenance Manual
30
Correctional Facility – User Optional Wiring
A special terminal strip has been pre-wired in Correctional facilities models to the three user relay
outputs for easy field wiring of the common interconnect options. If alternate output functions are
required, see page 30, titled Options for User Programmable Output Relays 1-3.
Connecting an Interlocked Pair:
An interlocked pair of operators is not a Master/Slave system, but is simply two gate operators
interlocked such that the one cannot open unless the other is fully closed. This connection is used
frequently at correctional facilities for Sally Port gates. The Smart Touch Controller provides both an
interlock input (#7) and the interlock output contact that is required.
1. User relay 1 on the Smart Touch Board has been set by the factory to provide the necessary
interlock function. Connect a total of four wires between operator #1 and operator #2 as follows:
One wire to the Common buss of
each
operator to the User 1 relay COM terminal of the other
operator. Then, connect wires from the User 1 relay NC terminal to the Interlock input (#7) of the
other operator.
2. If User relay 1 has already been used for a different function, then one of the other relays User 2
or User 3 must be wired as described above and set to output function 1. The user relays are
configured in the Installer Menu as item [r1__], [r2__] or [r3__] according to the definitions
described on page 31.
3. The interlock input, terminal #7, is convertible to alternately be a time clock input, so it is possible
that it may need to be switched back for the interlock function. If this alteration is needed, go to
the Installer Menu, and set item [tC _] to be [tC_1].
Connecting to an External Lock Mechanism:
An external solenoid lock or maglock can be controlled by the Smart Touch Controller to unlock just
before gate motion begins.
1. User relay 2 has been set by the factory to provide the necessary output for a solenoid lock.
Connect the voltage matching the lock solenoid to User 2 COM and connect a solenoid coil to
User 2 NO (connect a maglock coil to User 2 NC). The un-switched solenoid or maglock wire
connects directly to its supply voltage common conductor.
2. If User relay 2 has already been used for a different function, then one of the other relays User 1
or User 3 must be wired as described above and set to output function 6. The user relays are
configured in the Installer Menu as item [r1__], [r2__] or [r3__] according to the definitions
described on page 31.
Connecting the Gate Secure Position Indicator Output:
An external device can be signaled by the Smart Touch Controller to indicate the gate is secure.
1. User relay 3 has been set by the factory to provide the necessary output for position indication.
Connect the voltage matching the indicator light to User 3 COM and connect the gate secure light
to User 3 NC. The other indicator light wire connects directly to the voltage common conductor.
If an unsecured light is required, connect it to User 3 NO.
2. If User relay 3 has already been used for a different function, then one of the other relays User 1
or User 2 must be wired as described above and set to output function 1. The user relays are
configured in the Installer Menu as item [r1__], [r2__] or [r3__] according to the definitions
described on page 31.
Содержание HRG 220 ST
Страница 15: ...Installation and Maintenance Manual 9 Swing Gate Post Details ...
Страница 16: ...Installation and Maintenance Manual 10 HRG 220 Pump Pack ...
Страница 17: ...Installation and Maintenance Manual 11 HRG 222 Pump Pack ...
Страница 18: ...Installation and Maintenance Manual 12 How Our Hydraulic Swing Gates Work ...
Страница 25: ...Installation and Maintenance Manual 19 Instructions for Hand Pump or Manual Operation ...
Страница 29: ...Installation and Maintenance Manual 23 ...
Страница 47: ...Installation and Maintenance Manual 41 ...
Страница 48: ...Installation and Maintenance Manual 42 ...
Страница 62: ...Installation and Maintenance Manual 56 Battery Connection Diagram ...
Страница 63: ...Installation and Maintenance Manual 57 Battery Connection Diagram ...
Страница 65: ...Installation and Maintenance Manual 59 Wire Size Schedules ...
Страница 66: ...Installation and Maintenance Manual 60 Parts Breakout HRG 220 Pump Packs ...
Страница 67: ...Installation and Maintenance Manual 61 Parts Breakout HRG 222 Pump Packs ...
Страница 68: ...Installation and Maintenance Manual 62 Parts Breakout Control Box ...
Страница 69: ...Installation and Maintenance Manual 63 Parts Breakout Post ...
Страница 70: ...Installation and Maintenance Manual 64 Parts Breakout DC Power Supply ...