
Installation and Maintenance Manual
13
Installation Preparation Checklist
1. Read
all
of the instructions, especially the
Important Information at the beginning of this
manual, before you attempt installation. This
section is focused upon mechanical installation.
For electrical setup, skip to the section on
system configuration and use of the Smart
Touch Controller.
2. Check to see that the mounting slab is
the right size and ready to have an
operator attached. Also check that
electrical conduits are correctly located
to enter the operator base. Hy-Security
recommends the slab reaches below the
local frost line and is poured together
with supporting post or pilaster.
NOTE: The backing post/column, (provided by
others) must accommodate all of the "tip
over" loads imposed by the gate panel.
Installation Process Overview
•
Mount the control box and connect all
conduit fittings.
•
Mount the operator post.
•
Install all accessories such as: vehicle
sensing loops, access control devices,
gate edge sensors or photo eyes.
•
Pull all wires and hoses into conduits.
Note: HRG 220 comes with up to 40’ of
hose for the HRG 222 with up to 100’ of
hose, however, you must advise the
factory on the accurate amount of hose
desired or it will not be shipped with the
operator.
•
Test the basic operator functions.
•
Mount the gate panel and make fine
adjustments.
Содержание HRG 220 ST
Страница 15: ...Installation and Maintenance Manual 9 Swing Gate Post Details ...
Страница 16: ...Installation and Maintenance Manual 10 HRG 220 Pump Pack ...
Страница 17: ...Installation and Maintenance Manual 11 HRG 222 Pump Pack ...
Страница 18: ...Installation and Maintenance Manual 12 How Our Hydraulic Swing Gates Work ...
Страница 25: ...Installation and Maintenance Manual 19 Instructions for Hand Pump or Manual Operation ...
Страница 29: ...Installation and Maintenance Manual 23 ...
Страница 47: ...Installation and Maintenance Manual 41 ...
Страница 48: ...Installation and Maintenance Manual 42 ...
Страница 62: ...Installation and Maintenance Manual 56 Battery Connection Diagram ...
Страница 63: ...Installation and Maintenance Manual 57 Battery Connection Diagram ...
Страница 65: ...Installation and Maintenance Manual 59 Wire Size Schedules ...
Страница 66: ...Installation and Maintenance Manual 60 Parts Breakout HRG 220 Pump Packs ...
Страница 67: ...Installation and Maintenance Manual 61 Parts Breakout HRG 222 Pump Packs ...
Страница 68: ...Installation and Maintenance Manual 62 Parts Breakout Control Box ...
Страница 69: ...Installation and Maintenance Manual 63 Parts Breakout Post ...
Страница 70: ...Installation and Maintenance Manual 64 Parts Breakout DC Power Supply ...