Installation and Maintenance Manual
17
Mounting the Gate Panel, Index Arm, and Lock Pin Assembly
1)
Mount the gate panel with at least six 3/8” bolts (not provided) through both sides of the 11” hinge.
Be certain to provide the correct clearance between the gate and the road surface. Allow 3”
clearance at the far end of the gate panel. See drawings for gate panel clearance dimensions.
2)
Clamp the index arm mounting bracket near the bottom of a vertical member of the gate. The best
attachment point is at the one-third to one-half of the gate length from the gate hinge.
3)
Cut the index arm to the correct length and drill a 1/2” hole through the 2 x 2 tube where it will attach
to the swing gate post. Connect the threaded rod end of the Index arm to the mounting bracket on
the gate panel and bolt the cut end of the index arm between the tabs on the operator post assembly.
4)
Mount the locking pin mechanism on the lower corner of the free end of the gate panel in such a
position that the pin penetrates 2" into a lock receptacle when the gate is fully closed.
5)
Bury the receptacle tube in the roadway to act as a
socket for the locking pin. If the assembly provided by
Hy-Security is not used, the tube should have an
angular cut on the tip and project about two inches
above the grade to act as a "catch" for the locking pin.
Use a 3-1/2" x 1-1/2” tube of appropriate length for this
purpose. Use blacktop or grout to create a mound
around the exposed tube, so passing vehicles encounter
a smooth bump.
Содержание HRG 220 ST
Страница 15: ...Installation and Maintenance Manual 9 Swing Gate Post Details ...
Страница 16: ...Installation and Maintenance Manual 10 HRG 220 Pump Pack ...
Страница 17: ...Installation and Maintenance Manual 11 HRG 222 Pump Pack ...
Страница 18: ...Installation and Maintenance Manual 12 How Our Hydraulic Swing Gates Work ...
Страница 25: ...Installation and Maintenance Manual 19 Instructions for Hand Pump or Manual Operation ...
Страница 29: ...Installation and Maintenance Manual 23 ...
Страница 47: ...Installation and Maintenance Manual 41 ...
Страница 48: ...Installation and Maintenance Manual 42 ...
Страница 62: ...Installation and Maintenance Manual 56 Battery Connection Diagram ...
Страница 63: ...Installation and Maintenance Manual 57 Battery Connection Diagram ...
Страница 65: ...Installation and Maintenance Manual 59 Wire Size Schedules ...
Страница 66: ...Installation and Maintenance Manual 60 Parts Breakout HRG 220 Pump Packs ...
Страница 67: ...Installation and Maintenance Manual 61 Parts Breakout HRG 222 Pump Packs ...
Страница 68: ...Installation and Maintenance Manual 62 Parts Breakout Control Box ...
Страница 69: ...Installation and Maintenance Manual 63 Parts Breakout Post ...
Страница 70: ...Installation and Maintenance Manual 64 Parts Breakout DC Power Supply ...