P/N 0501930_G
1-3
HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 U.S.A.
Ultra Low Front
Rear Load
Excel
SETTING REAR LOAD MERCHANDISER
The rear load merchandiser is installed in
a cooler wall . The illustrations below show
the relationship between the wall and the
merchandiser . The rear of the canopy extends
through the cooler wall . Note that the uprights
are forward of the wall with the merchandiser
end closing the gap .
MERCHANDISER LEVELING
Merchandisers must be installed level to ensure
proper operation of the refrigeration system
and to ensure proper drainage of defrost
water . During all steps of setting, joining and
leveling merchandisers, close attention to
position and operation must be maintained .
NOTE:
b
egin
lineup
leveling
from
The
highesT
poinT
of
The
sTore
floor
.
C
O
O
L
E
R
W
A
L
L
IMPORTANT
Do not remove shipping braces from
BI-FOLD DOORS
until the lineup is complete including joining
and end installation .
Bi-fold door set-up and operating
instructions begin on Page 1-17
W
Opening Required in Cooler Wall
Cooler Opening
D6X-URLE 90
1
/
2
in.
D5X-URLE 83
3
/
4
in.
Front View
Cooler Wall
W = Total Length of lineup without ends +
3
/
4
inch
D5X-12URLE = 144
1
/
2
in. (3670 mm)
D6X-12URLE = 144
1
/
2
in. (3670 mm)
D5X-8URLE = 96
3
/
8
in. (2448 mm)
D6X-8URLE = 96
3
/
8
in. (2448 mm)
Top View of D6X-URLE
D5X-URLE
Top View
Cooler Wall
1-in. Gasket
(apply top to
bottom of
end assembly)
End Assemb
ly
Side View