INSTALLATION
6
Mount the Installation Brackets — Outside Mount
■
Center the headrail over the window opening at the desired height. Use a pencil to lightly
mark each end of the headrail.
➤
Alternatively, measure the width of the headrail and use that width to mark the headrail
end points over the window opening.
■
Mark 2" in from each of the headrail end marks.
➤
If more than two installation brackets are required (see table on page 3), mark the
location of additional bracket(s) spaced evenly between the two end bracket locations.
Mount into wood whenever possible.
Allow a minimum of 18" from the motor side
for the battery wand.
■
Center the installation brackets or extension brackets on your marks and mark where to drill
the screw holes.
➤
A minimum 1" flat vertical surface is required for the installation brackets. Extension
brackets require 1
1
/
4
".
➤
The tops of the installation brackets or extension brackets should be at the desired
height. The brackets should be level and aligned.
CAUTION:
The rear of the brackets must be flush against a flat mounting surface. Do not
mount brackets on curved molding.
■
Drill the screw holes using a
3
/
32
" drill bit.
CAUTION:
Use drywall anchors when mounting into drywall.
Window Opening
2"
Motor
Side
2"
Headrail End Marks
Space Evenly
Space Evenly
18" Minimum for Battery Wand
1"
Extension
Bracket
1
1
/
4
"
Содержание Nantucket PowerView
Страница 1: ...Installation Operation Care Silhouette and Nantucket Window Shadings PowerView Motorization ...
Страница 30: ...Notes ...
Страница 31: ......