INSTALLATION
5
■
Mark the location of the screw holes.
➤
The minimum depth required for mounting is 2" with
a battery wand and a back cover.
➤
Minimum depth is 1
1
/
4
"
with a satellite battery pack
or 18V DC power supply and back cover.
➤
The depth required for fully recessed mounting will
vary depending on the type of headrail and vane size.
Refer to the chart below for depth requirements.
IMPORTANT:
The front edges of the installation brackets must be level and aligned.
WARNING:
Failure to properly align the brackets could result in the headrail
releasing from the brackets.
■
Drill the screw holes using a
3
/
32
" drill bit.
CAUTION:
Use drywall anchors when mounting into drywall.
■
Use a level to check that the mounting surface is level. If necessary, you can shim (not
provided) the brackets.
■
Attach the installation brackets using the screws provided.
IMPORTANT:
Do not overtighten the screws. Check to
ensure the lever can be moved easily side to side. If not,
loosen the screws in one-eighth turn increments until the
lever can be moved easily.
Proceed to “STEP 2: Mount the Battery Wand and Connect the Power Cable” on page 9.
Fully Recessed
Mounting Depths
Classic
Headrail
Quartette
®
4"
Headrail
Battery Wand and Back Cover
4
1
/
16
"
4
9
/
16
"
Satellite Battery Pack or 18V DC
Power Supply and Back Cover
3
1
/
2
"
4"
Minimum
Depth
2" Battery Wand
1
1
/
4
" Battery Pack or
18V DC Power Supply
2"
Содержание Nantucket PowerView
Страница 1: ...Installation Operation Care Silhouette and Nantucket Window Shadings PowerView Motorization ...
Страница 30: ...Notes ...
Страница 31: ......