Page 32
ALPHA DEEP CHANNEL AWNING INSTALLATION
STEP 1 - INSTALL HEADBOX OR OPEN ROLLER
STEP 2 - OPEN THE CHANNEL FRONT COVER
Refer to the following sections for instructions
i - open roller install (pg7)
ii - headbox install (pg9)
The installation channel will be supplied fully assembled
(Back Channel, Brush, Front channel with Top and Bot-
tom channel caps attached).
- Disconnect the front Channel by leveraging pressure
on the Inside edge. If needed use a screw driver in the
shadow detail to assist with the disconnect.
STEP 3 - INSTALL THE BACK CHANNEL
STEP 4 - INSTALL THE ROLLER TUBE
Refer to installing the roller tube section (pg12)
Use the bolt attached to the top channel cap to locate
the bottom hole of the installation bracket. (Face fit installs
only) This will ensure the channel is correctly lined up.
- Secure the back channel to the fixing surface every
700mm. Use a spirit level to ensure the channel is level.
STEP 5 - FEED FABRIC INTO THE BACK CHANNEL
STEP 6 - ATTACH CHANNEL FRONT COVER
Lower the awning approximately 100mm from top.
- Feed the fabric through the top channel cap.
Fully lower and raise the awning to ensure the installation
is square.
- Once satisfied, snap on the front cover using the hook
detail and leveraging pressure on the outside edge of
the front cover.
ALPHA
AWNING SERIES INSTALLATION MANUAL
Содержание ALPHA Series
Страница 1: ...11 2019 ALPHA AWNING SERIES INSTALLATION AND MEASURING GUIDELINES INCLUDES THE SRS V2 ...
Страница 51: ...Page 49 ...
Страница 52: ......