
Page 2
A minimum of 2 people are necessary for proper installation.
PLEASE NOTE:
Installation fixings will NOT be supplied with any of the ALPHA Awning Series.
Please refer to fixing section. Each installation should be assessed on a case by case scenario.
WARNING!
– The brackets must be fixed solidly to a substantial surface. Hollow bricks or foam
products are not suitable. Brick veneer surfaces require at least 2 courses of brickwork above the
bracket and 2 courses below.
GENERAL ADVICE
The electrical data is shown on the label of electric operating awnings.
Tools: The following tools are required for installation:
• Level
• Battery Drill
• Screwdrivers
• Hammer Drill
• Drill Bits
• Spanner - 7mm (size of open end spanner for top aligner)
• Allen Key
SAFETY AND WARNING ADVICE
ALPHA
AWNING SERIES INSTALLATION MANUAL
Содержание ALPHA Series
Страница 1: ...11 2019 ALPHA AWNING SERIES INSTALLATION AND MEASURING GUIDELINES INCLUDES THE SRS V2 ...
Страница 51: ...Page 49 ...
Страница 52: ......