
Page 24
ALPHA SRS (SIDE RETENTION SYSTEM) V2
AWNING INSTALLATION
STEP 1 - INSTALL HEADBOX OR OPEN ROLLER
Refer to the following sections for instructions
i - open roller install (pg7)
ii - headbox install (pg9)
STEP 2 - OPEN THE CHANNEL FRONT COVER
The installation channel will be supplied fully assembled (Back Channel,
Floating Channel, Front channel with Top and Bottom channel caps
attached.
a) Check if front cover fixing screws
at top of bottom end caps are
used, if so remove screws.
Note: An installed awning will have
these in place.
b) Slide front cover towards middle
of blind about 12mm where it will
stop. This operation can be per-
formed on either end of channel.
b) Front cover can then be
removed by lifting towards user.
ALPHA
AWNING SERIES INSTALLATION MANUAL
Содержание ALPHA Series
Страница 1: ...11 2019 ALPHA AWNING SERIES INSTALLATION AND MEASURING GUIDELINES INCLUDES THE SRS V2 ...
Страница 51: ...Page 49 ...
Страница 52: ......