Page 9
HEADBOX INSTALLATION
STEP 2 - REMOVE ROLLER TUBE
STEP 3 - MARK & PRE DRILL HEADBOX BACK PANEL
- MARK FIXING HOLES ON INSTALLATION SURFACE
- DRILL FIXING HOLES ON INSTALLATION SURFACE
- INSTALL HEADBOX THROUGH BRACKETS
STEP 1 - OPEN THE HEADBOX
ACCESSORIES
INSTALLATION SPREADER PLATE
PLEASE REFER TO RELEVANT SECTION FOR INSTRUCTIONS
ALPHA
AWNING SERIES INSTALLATION MANUAL
Содержание ALPHA Series
Страница 1: ...11 2019 ALPHA AWNING SERIES INSTALLATION AND MEASURING GUIDELINES INCLUDES THE SRS V2 ...
Страница 51: ...Page 49 ...
Страница 52: ......