CONTENTS
1.0
USERS INSTRUCTIONS
. . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
page
3
2.0
USERS PRE-SERVICE CHECK LIST
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page
6
3.0 BOILER REGISTRATION
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page
7
4.0
COMMISSIONING BOILER CHECK LIST
5.0
SERVICE RECORDS
6.0 INSTALLERS INSTUCTIONS
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
page
8
page
9
page 12
FONDERIE SIME S.p.A.
of Via Garbo 27 - Legnago (VR) - Italy declares that its hot water boilers, which bear the CE
mark under Gas Directive 90/396/CEE and are fitted with a safety thermostat calibrated to a maximum of 110° C,
are not subject
to application of PED Directive 97/23/CEE as they meet the requirements of article 1 paragraph
3.6 of the Directive.
All descriptions and illustrations provided in this manual have been carefully prepared but we reserve the right to make change
and improvements in our products that may affect the accuracy of the information contained in this manual
.
This Warranty is granted to you by Hunt Heating ABN 50 354
796 935, in respect of your acquisition of a Sime Central
Heating Boiler within the Commonwealth of Australia. This
Warranty does not in any way affect your rights under any
Trade Practices Act, and is in addition to your implied legal
rights.
Provided that the installation of the boiler is in accordance
with the specifications provided to you or your licensed instal-
ler, the boiler is warranted by Hunt Heating against defects
caused by the manufacturer’s faulty materials and/or work-
manship, in respect to parts and labour, for a period of twelve
months commencing from the date of commissioning of the
boiler. or a maximum of 18 months from the date of delivery
from Hunt Heating which ever is the earlier
The Licensed Installer must complete the information at the
in section 3.0 of this manual. Failure to do so may cause the
Warranty to beco me null and void.
SIME CENTRAL HEATING BOILERS - WARRANTY
This document File - “FORMAT DGT 30 BOILER V1" -
June 2010
issued
Page 2 of 34
INSTALLATION AND ALL SERVICING MUST BE
CARRIED OUT BY AN AUTHORISED PERSON
IMPORTANT
When carrying out the commissioning of the boilers, it is highly recommended that you perform the following checks:
– Make sure that there are no flammable liquids and or materials in the immediate vicinity of the boiler.
– Make sure that the electrical connections have been made correctly and that the earth wire is connected to a good
earthing system.
– Open the gas tap and check the soundness of the connections, including that of the burner.
– Make sure that the boiler is set for operation for the type of gas supplied.
– Check that the flue for the outlet of the products of the combustion is unobstructed.
– Make sure that any shutoff valves are open.
– Make sure that the system is charged with water and is thoroughly vented.
Содержание sime 30e
Страница 33: ...BLANK PAGE Page 33 of 34...