A s uggested me thod of co mmissioning th
e bo iler, ac tual me thod ca n v ary ac cording to th
e bo iler
make type and the installation. The boiler must always be installed and commissioned by an approved
,
gas te chnician. The i nstaller ce rtifies th
at this Boiler has b een in stalled to the manufacturer’s
instructions, has been filled, commissioned and is ready for use.
No. Description
ü
when done
1.
Read carefully th
e in struction ma nuals s upplied wi th t his bo iler.
BEFORE INSTALLING T HIS B OILER FLUSH OUT THE PIPES UNTIL CLEAN WATER IS ACHIEVED.
2
–
.
3.
T
urn on wa ter to fi ll s ystem, ch
eck fo r le aks r egularly an d b leed a ir fr om al l points.
B leed the air fr om all th e p umps i n the system, and r otate th e im
peller sh
aft
4
Check th
at al l r adiators v alves ar e op en, remove th
e thermostatic valve heads, fully open
all
lockshield valves.
5
Turn ON g as, bl eed a ir ou t at th
e i solation va lve u nion. Re seal an d ch
eck fo r gas leaks.
Tu rn g as OF
F.
6
Turn e lectricity on at th
e po wer po int. At th
e bo iler fr ont pa nel se t th
e temperature setting
to th
e lo west s etting, s witch b oiler to ON po sition.
The “Power on ” In dicator sh ould lig ht. Tu rn th
e bo iler of f at th
e fr ont pa nel.
7
Turn th
e r oom th
ermostat to th
e ma nual O N po sition s et th
e t emperature to a high level so that it does
no t s witch of f du ring th
e co mmissioning ph
ase. Th
e thermostat will unusually click and show an
In dicator in th
e wi ndow,
8
Switch th
e bo iler ON a t th
e bo iler fr ont pa nel co ntrol.
9
Boiler sh
ould s tart fa n, pu mp an d ig nite g as. If it fa ils fi rst f ew t imes th
is m ay be just residual air
In th
e gas line. A noisy water pump indicates there is air in the water pipes.
10.
Boiler lights a nd heats the water.
11.
Check g as flame is th
e co rrect co lour an d fo r gas an d wa ter le aks
as the system heats up . Check inlet and outlet gas pressures.
12.
Check th
at h eat i s go ing t o a ll r adiators th
rough th
e m anual or th
ermostatic first
and r eturn via the lo ckshield v alve. If no t S TOP fi x NO
W and any leaks.
13
Allow th
e bo iler to hea t u p to th
e se t te
mperature an d sw
itch of f. Re-adjust the boiler temperature
14
to a mi d t emperature po int.
CA UTION
, If t his is connected to a floor heating system. The boiler
sh
ould re li ght a nd in crease th
e water temperature to the new setting.
15
Check th
at a ll r adiators a re hot al l th
e wa y u p. If t he r adiator is co ld at th
e to p,
then th
ere is u sually a ir in th
e r adiator Bleed the radiator. Balance the system so that all.
16.
Set th
e r oom th
ermostat to th
e co rrect t imes a nd t emperatures ac cording to the ma nufacture’s
On completion of the commissioning phase, complete the information sheet at the front of this manual.
Hand over the installation to the owner and demonstrate how the system works plus basic fault
resolution and safety procedures. Make sure that this important document is kept in a safe accessible
place for subsequent use.
Turn off all services to this boiler - water, gas and power. Install the boiler as shown in the
instructions following and connect all services.
radiators are hot as according to the radiator installation manual. Adjust the boiler water temperature.
instructions