INSTALLATION MANUAL
Page 8 of 15
HUBER+SUHNER disclaims any liability resulting from incorrect installation and use, including any damages resulting from the use of tools and
accessories other than the ones recommended herein. Any installation performed by unqualified personnel voids the product warranty provided by
HUBER+SUHNER. All due care and attention must be exercised when performing the installation of these products. For advice concerning the
general handling of these products please contact HUBER+SUHNER.
BASE STATION END OF ASSEMBLY
Step 1
After unwinding the whole assembly from the reel, while
handling the assembly make sure to leave the pulling tube as
long as possible on the assembly.
Pulling tube ensures IP65 and gives protection to the FO and
DC tails inside.
Step 2
To remove protective tube hold tube and loosen gland nut.
Do NOT twist the tube at any stage of removal.
Pull tube off to reveal the tails within.
Step 3
Remove gland nut from cable and keep it safe.
Step 4
Feed tails through cabinet/cabin.
Step 5
Mark the “strip-back point” using tape.