INSTALLATION MANUAL
Page 11 of 15
HUBER+SUHNER disclaims any liability resulting from incorrect installation and use, including any damages resulting from the use of tools and
accessories other than the ones recommended herein. Any installation performed by unqualified personnel voids the product warranty provided by
HUBER+SUHNER. All due care and attention must be exercised when performing the installation of these products. For advice concerning the
general handling of these products please contact HUBER+SUHNER.
Step 19
If earthing is required outside cabinet/cabin use universal
grounding kit and follow separate instructions.
NOTE: the earthing cable can also come in black.
Step 20
Store any fibre optic cable over-length inside base station by
using cable over-length storage box which can be mounted on a
wall, panel or mounted horizontally within an equipment rack.
Over length box
HUBER+SUHNER Item no 84103325
Step 21
Release snap-lock fastener using a screwdriver.
Step 22
Carefully remove protective tube to gain access to fibre optic
tails.
Step 23
Route fibre optic tails carefully and following a smooth route to
their respective connection points. Remove dust caps of LC
connectors and plug into equipment.