UPS5000-E-(25 kVA-75 kVA)-BF
User Manual
3 Installation
Issue 07 (2019-12-13)
Copyright © Huawei Technologies Co., Ltd.
95
No.
Item
Acceptance Criteria
03
Cable layout
Cables are routed properly and cable routing
meets customer requirements.
04
Cable labels
Both ends of a cable are labeled. Labels are
concise and easy to understand.
05
Cable ties
Distances between cable ties are the same, and
no burr exists.
06
Cable connections
The battery cables are securely connected. For
the cables secured by screws, the washers are
flattened.
07
Grounding
The resistance between the battery cabinet
ground bar and the equipment room ground bar
is less than 0.1 ohm.
08
Battery cables
The battery strings are correctly connected to
the UPS.
09
Battery module assembly
(users should pay attention to
this item when assembling
battery modules by themselves)
If users assemble the battery module by
themselves, cables are properly connected and
bound inside the battery module. After
assembly, the eight screws of the battery
module are tightened. The voltage between the
positive and negative terminals of the battery
module is within the range of 96 V to 144 V.
10
Battery module installation
The battery module is fully inserted into the
cabinet. The ready switch is in locked state.
11
Operating environment
Conductive dust and other sundries are cleaned
inside and outside the cabinet, as shown in
1.
Ensure that there is no foreign matter at the
copper bar terminals.
2.
Ensure that there is no foreign matter on the
switches, in the switch terminal groove, and
between copper bars above the switches.
3.
Ensure that there is no foreign matter on the
bottom plate of the cabinet.