SmartLogger1000
User Manual
7 WebUI
Issue 12 (2019-01-15)
Copyright © Huawei Technologies Co., Ltd.
241
Figure 7-67
Network diagram (with a circuit breaker)
In the scenario with circuit breaker, put the power supply position of the SmartLogger before
the circuit breaker to avoid the SmartLogger power-off after the DO control circuit breaker is
switched off.
Setting Parameters
Before setting the parameters, ensure that the Modbus power meter and inverter are connected
to the WebUI. Then take the following steps to complete the settings.
1.
Log in as
Advance User
, choose
Monitoring
>
SUN2000
>
Running Param.
>
Feature Parameters
, and set the following parameters.
Parameter
Description
Recommended Value
Communication
interrupt shutdown
The standards of certain countries
and regions require that the
inverter must shut down after the
communication is interrupted for a
certain time.
Enable
Communication
resumed startup
If this parameter is enabled, the
inverter automatically starts after
communication recovers. If this
parameter is disabled, the inverter
needs to be started manually after
communication recovers.
Enable
Communication
interruption duration
Specifies the duration for
determining communication
interruption, and is used for
automatic shutdown for protection
in case of communication
interruption.
1