![Huawei S6700 Series Скачать руководство пользователя страница 366](http://html.mh-extra.com/html/huawei/s6700-series/s6700-series_configuration-manual_169517366.webp)
#
isis 1
is-level level-2
network-entity aa.3333.3333.3333.00
#
interface Vlanif30
ip address 100.2.1.2 255.255.255.0
isis enable 1
#
interface XGigabitEthernet0/0/1
port hybrid pvid vlan 30
port hybrid untagged vlan 30
#
return
6.18.7 Example for Configuring Dynamic BFD for IS-IS
Networking Requirements
l
Run IS-IS on Switch A, Switch B, and Switch C.
l
Enable BFD of the IS-IS process on Switch A, Switch B, and Switch C.
l
Traffic is transmitted on the active link Switch A
→
Switch B. The link Switch A
→
Switch
B
→
Switch C acts as the standby link.
l
Enable BFD of the interface on the link between Switch A and Switch B. When the link
between Switch A and Switch B fails, BFD can quickly detect the fault and notify IS-IS of
the fault; therefore, the traffic is transmitted on the standby link.
Figure 6-9
Networking diagram for configuring the dynamic BFD
Switch A
SwitchB
SwitchC
XGE0/0/2
3.3.3.1/24
XGE0/0/2
3.3.3.2/24
XGE0/0/3
172.16.1.1/24
XGE0/0/1
1.1.1.1/24
XGE0/0/1
1.1.1.2/24
XGE0/0/1
2.2.2.2/24
XGE0/0/2
2.2.2.1/24
Switch
Interface
VLANIF interface
IP address
Switch A
XGE0/0/1
VLANIF 10
1.1.1.1/24
Switch A
XGE0/0/2
VLANIF 20
3.3.3.1/24
Switch B
XGE0/0/1
VLANIF 50
2.2.2.2/24
Switch B
XGE0/0/2
VLANIF 20
3.3.3.2/24
Switch B
XGE0/0/3
VLANIF 40
172.16.1.1/24
S6700 Series Ethernet Switches
Configuration Guide - IP Routing
6 IS-IS Configuration
Issue 01 (2012-03-15)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
347