If cables are not connected as
shows, a server
reports alarm 1B01FFFF. Reconnect the cables to clear the alarm.
Prerequisites
Conditions
●
You have powered off the RH8100 V3. For details, see
. Then you have removed all power cables from the server.
●
You have removed the front I/O module from the RH8100 V3. For details, see
5.8.1 Removing the Front I/O Module
.
●
You have removed the supercapacitor tray. For details, see
.
Data
●
You have obtained the cabinet number and chassis number of the RH8100 V3.
●
You have located the RH8100 V3 based on the preceding information, and
labeled its panel to prevent misoperations.
●
You have determined the position on the RH8100 V3 for installing a RAID
controller card.
Tools
●
ESD gloves
●
M3 Phillips screwdriver
●
Packaging materials, for example, an ESD bag
Hardware
Spare RAID controller card
Procedure
Step 1 Wear an ESD wrist strap or ESD gloves. For details, see
.
Step 2 Take the spare RAID controller card out of its ESD bag.
Step 3 Align the connector on the RAID controller card with the port on the mainboard,
and insert the RAID controller card slowly into the mainboard. See step (1) in
.
Step 4 Tighten the screws on the RAID controller card. See step (2) in
.
RH8100 V3 Server
User Guide
5 Removing and Installing Parts of the RH8100 V3
Issue 30 (2019-12-19)
Copyright © Huawei Technologies Co., Ltd.
243