Step 16
Remove memory modules.
4.3.15 Removing a Memory Module
.
Step 17
Remove processors.
.
Step 18
Remove the mezzanine cards.
4.3.11 Removing a Mezzanine Card
.
Step 19
Remove the battery.
Step 20
Place the removed compute node case and components in different ESD bags.
NOTE
Before placing the mainboard and the compute node case into an ESD bag, ensure that the processor
sockets are installed with covers.
----End
4.3.24 Installing the Mainboard and Compute Node Case
Procedure
Step 1
Take the spare part out of its ESD bag.
Step 2
Place the compute node on the ESD workstation.
Step 3
Determine the position of the mainboard and the compute node case.
Figure 4-61
Mainboard and compute node case
FusionServer Pro CH121 V5 Compute Node
Maintenance and Service Guide
4 Parts Replacement
Issue 06 (2019-08-10)
Copyright © Huawei Technologies Co., Ltd.
103