1.
Aligning the notches on the cover with the nail heads on the chassis base, vertically place
the cover onto the compute node. See (1) in
2.
Push the cover towards the front panel of the compute node until the cover clicks into
place. See (2) in
.
Figure 3-11
Installing the cover
Step 4
Install the compute node.
.
Step 5
Power on the compute node.
----End
3.7 Removing the Air Ducts
Procedure
Step 1
Power off the compute node.
Step 2
Remove the compute node.
Step 3
Place the compute node on the ESD workstation.
Step 4
Remove the cover.
.
Step 5
Determine the position of the air duct.
FusionServer Pro CH121 V5 Compute Node